AIRLINK 80.60 Increased By ▲ 1.19 (1.5%)
BOP 5.26 Decreased By ▼ -0.07 (-1.31%)
CNERGY 4.52 Increased By ▲ 0.14 (3.2%)
DFML 34.50 Increased By ▲ 1.31 (3.95%)
DGKC 78.90 Increased By ▲ 2.03 (2.64%)
FCCL 20.85 Increased By ▲ 0.32 (1.56%)
FFBL 33.78 Increased By ▲ 2.38 (7.58%)
FFL 9.70 Decreased By ▼ -0.15 (-1.52%)
GGL 10.11 Decreased By ▼ -0.14 (-1.37%)
HBL 117.85 Decreased By ▼ -0.08 (-0.07%)
HUBC 137.80 Increased By ▲ 3.70 (2.76%)
HUMNL 7.05 Increased By ▲ 0.05 (0.71%)
KEL 4.59 Decreased By ▼ -0.08 (-1.71%)
KOSM 4.56 Decreased By ▼ -0.18 (-3.8%)
MLCF 37.80 Increased By ▲ 0.36 (0.96%)
OGDC 137.20 Increased By ▲ 0.50 (0.37%)
PAEL 22.80 Decreased By ▼ -0.35 (-1.51%)
PIAA 26.57 Increased By ▲ 0.02 (0.08%)
PIBTL 6.76 Decreased By ▼ -0.24 (-3.43%)
PPL 114.30 Increased By ▲ 0.55 (0.48%)
PRL 27.33 Decreased By ▼ -0.19 (-0.69%)
PTC 14.59 Decreased By ▼ -0.16 (-1.08%)
SEARL 57.00 Decreased By ▼ -0.20 (-0.35%)
SNGP 66.75 Decreased By ▼ -0.75 (-1.11%)
SSGC 11.00 Decreased By ▼ -0.09 (-0.81%)
TELE 9.11 Decreased By ▼ -0.12 (-1.3%)
TPLP 11.46 Decreased By ▼ -0.10 (-0.87%)
TRG 70.23 Decreased By ▼ -1.87 (-2.59%)
UNITY 25.20 Increased By ▲ 0.38 (1.53%)
WTL 1.33 Decreased By ▼ -0.07 (-5%)
BR100 7,626 Increased By 100.3 (1.33%)
BR30 24,814 Increased By 164.5 (0.67%)
KSE100 72,743 Increased By 771.4 (1.07%)
KSE30 24,034 Increased By 284.8 (1.2%)

high tension wireKARACHI: Improved fuel supply to power generation units, end to electricity theft and regular billing could help end load-shedding in the metropolis, said KESC COO Tabish Gohar here on Wednesday.

"We need uninterrupted and smooth supply of gas and furnace oil to our power generation units," he said while addressing a press conference.

He said there was no deliberate attempt by the management of KESC to resort to load-shedding and resented power riots and attacks on KESC offices.

"Some hidden elements are involved in various acts of violence against KESC," he alleged without pointing out finger on any group.

He was of the view that differences between the management and employees should not cause inconvenience to the customers as issues could be solved through negotiations.

Despite being over staffed, last year 6,500 employees were regularised and a Human Resource Committee was being set up to look into all aspects pertaining to the employees.

Tabish Gohar said that billing system has been improved to a great extent.

About various measures taken by KESC to improve power production, he said a bio-fuel gas project has already been launched in Landhi area and a 700 MW plant will also start production later this year.

"During the last two and a half years, 400 MW power supply has been added into the system," he added.

 

Copyright APP (Associated Press of Pakistan), 2011 

 

Comments

Comments are closed.