AIRLINK 79.41 Increased By ▲ 1.02 (1.3%)
BOP 5.33 Decreased By ▼ -0.01 (-0.19%)
CNERGY 4.38 Increased By ▲ 0.05 (1.15%)
DFML 33.19 Increased By ▲ 2.32 (7.52%)
DGKC 76.87 Decreased By ▼ -1.64 (-2.09%)
FCCL 20.53 Decreased By ▼ -0.05 (-0.24%)
FFBL 31.40 Decreased By ▼ -0.90 (-2.79%)
FFL 9.85 Decreased By ▼ -0.37 (-3.62%)
GGL 10.25 Decreased By ▼ -0.04 (-0.39%)
HBL 117.93 Decreased By ▼ -0.57 (-0.48%)
HUBC 134.10 Decreased By ▼ -1.00 (-0.74%)
HUMNL 7.00 Increased By ▲ 0.13 (1.89%)
KEL 4.67 Increased By ▲ 0.50 (11.99%)
KOSM 4.74 Increased By ▲ 0.01 (0.21%)
MLCF 37.44 Decreased By ▼ -1.23 (-3.18%)
OGDC 136.70 Increased By ▲ 1.85 (1.37%)
PAEL 23.15 Decreased By ▼ -0.25 (-1.07%)
PIAA 26.55 Decreased By ▼ -0.09 (-0.34%)
PIBTL 7.00 Decreased By ▼ -0.02 (-0.28%)
PPL 113.75 Increased By ▲ 0.30 (0.26%)
PRL 27.52 Decreased By ▼ -0.21 (-0.76%)
PTC 14.75 Increased By ▲ 0.15 (1.03%)
SEARL 57.20 Increased By ▲ 0.70 (1.24%)
SNGP 67.50 Increased By ▲ 1.20 (1.81%)
SSGC 11.09 Increased By ▲ 0.15 (1.37%)
TELE 9.23 Increased By ▲ 0.08 (0.87%)
TPLP 11.56 Decreased By ▼ -0.11 (-0.94%)
TRG 72.10 Increased By ▲ 0.67 (0.94%)
UNITY 24.82 Increased By ▲ 0.31 (1.26%)
WTL 1.40 Increased By ▲ 0.07 (5.26%)
BR100 7,506 Increased By 12.9 (0.17%)
BR30 24,683 Increased By 124.5 (0.51%)
KSE100 71,971 Decreased By -80.5 (-0.11%)
KSE30 23,749 Decreased By -58.8 (-0.25%)

imageFAISALABAD: Prime Minister Muhammad Nawaz Sharif Saturday inaugurated 40 megawatts (MW), coal fired power project at Sitara Chemical Industries Ltd (SCIL) here.

The prime minister was accompanied by Governor Punjab Malik Rafiq Rajwana, Minister for Water and Power Khawaja Asif, Minister for Planning Ahsan Iqbal, Minister for Commerce Khurram Dastgir and Minister of State for Water and Power Abid Sher Ali.

The 40 MW coal power plant at Sitara Chemical Industries Ltd is the largest of its kind in the industrial sector of Faisalabad. Sitara Chemical Industries Ltd is the flagship company of Sitara Group.

The prime minister unveiled the plaque of the project that has been completed within 27 months costing Rs 3.5 billion.

The plant's boiler is based on Circulating Fluidized Bed Combustion technology having the best automation system.

Continuous emission monitoring system is placed which monitors 24/7 the emission of the gases in the air to protect the environment.

According to a PM House statement, commissioning of 40 mega watts Coal Fired Power Plant is a step towards achieving self-reliance in power generation. Such initiatives by the private sector are extremely encouraging and will prove helpful in overcoming the energy shortage from Pakistan.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.