AIRLINK 79.00 Decreased By ▼ -0.41 (-0.52%)
BOP 5.30 Decreased By ▼ -0.03 (-0.56%)
CNERGY 4.36 Decreased By ▼ -0.02 (-0.46%)
DFML 33.35 Increased By ▲ 0.16 (0.48%)
DGKC 75.98 Decreased By ▼ -0.89 (-1.16%)
FCCL 20.39 Decreased By ▼ -0.14 (-0.68%)
FFBL 31.37 Decreased By ▼ -0.03 (-0.1%)
FFL 9.80 Decreased By ▼ -0.05 (-0.51%)
GGL 10.19 Decreased By ▼ -0.06 (-0.59%)
HBL 116.75 Decreased By ▼ -1.18 (-1%)
HUBC 134.25 Increased By ▲ 0.15 (0.11%)
HUMNL 6.97 Decreased By ▼ -0.03 (-0.43%)
KEL 4.56 Decreased By ▼ -0.11 (-2.36%)
KOSM 4.66 Decreased By ▼ -0.08 (-1.69%)
MLCF 37.11 Decreased By ▼ -0.33 (-0.88%)
OGDC 135.80 Decreased By ▼ -0.90 (-0.66%)
PAEL 22.90 Decreased By ▼ -0.25 (-1.08%)
PIAA 26.87 Increased By ▲ 0.32 (1.21%)
PIBTL 6.90 Decreased By ▼ -0.10 (-1.43%)
PPL 113.31 Decreased By ▼ -0.44 (-0.39%)
PRL 27.35 Decreased By ▼ -0.17 (-0.62%)
PTC 14.74 Decreased By ▼ -0.01 (-0.07%)
SEARL 57.10 Decreased By ▼ -0.10 (-0.17%)
SNGP 66.77 Decreased By ▼ -0.73 (-1.08%)
SSGC 11.05 Decreased By ▼ -0.04 (-0.36%)
TELE 9.20 Decreased By ▼ -0.03 (-0.33%)
TPLP 11.65 Increased By ▲ 0.09 (0.78%)
TRG 72.00 Decreased By ▼ -0.10 (-0.14%)
UNITY 25.24 Increased By ▲ 0.42 (1.69%)
WTL 1.39 Decreased By ▼ -0.01 (-0.71%)
BR100 7,509 Decreased By -17 (-0.23%)
BR30 24,526 Decreased By -123.3 (-0.5%)
KSE100 71,788 Decreased By -183.3 (-0.25%)
KSE30 23,687 Decreased By -62.1 (-0.26%)

imageISLAMABAD: Power supply from Uch-1 (500 MW) and Uch-2 (300 MW) to the national grid system have suspended due to blowing up main gas pipeline by miscreants in Dera Murad Jamali.

According to the spokesman of National Transmission and Dispatch Company (NTDC), the miscreants had planted explosive material with the pipeline supplying gas to the Uch power plants.

The power shortfall in the country has also surged to 4,500 MW due to suspension of power supply from the power plants.

Currently the generation stood at 7,500 MW against the demand of 12,000 MW, the spokesman said

Copyright APP (Associated Press of Pakistan), 2015

Comments

Comments are closed.