AIRLINK 74.00 Decreased By ▼ -0.56 (-0.75%)
BOP 5.02 Decreased By ▼ -0.04 (-0.79%)
CNERGY 4.42 Decreased By ▼ -0.04 (-0.9%)
DFML 39.20 Decreased By ▼ -0.53 (-1.33%)
DGKC 86.09 Decreased By ▼ -1.46 (-1.67%)
FCCL 21.65 Decreased By ▼ -0.28 (-1.28%)
FFBL 34.01 Decreased By ▼ -0.58 (-1.68%)
FFL 9.92 Increased By ▲ 0.17 (1.74%)
GGL 10.56 Increased By ▲ 0.07 (0.67%)
HBL 113.89 Increased By ▲ 0.10 (0.09%)
HUBC 135.84 Decreased By ▼ -0.68 (-0.5%)
HUMNL 11.90 Increased By ▲ 1.00 (9.17%)
KEL 4.84 Increased By ▲ 0.17 (3.64%)
KOSM 4.53 Decreased By ▼ -0.11 (-2.37%)
MLCF 38.27 Decreased By ▼ -0.19 (-0.49%)
OGDC 134.85 Decreased By ▼ -1.29 (-0.95%)
PAEL 26.35 Decreased By ▼ -0.26 (-0.98%)
PIAA 20.80 Decreased By ▼ -1.69 (-7.51%)
PIBTL 6.68 Increased By ▲ 0.01 (0.15%)
PPL 123.00 Increased By ▲ 0.71 (0.58%)
PRL 26.69 Decreased By ▼ -0.28 (-1.04%)
PTC 14.33 Increased By ▲ 0.42 (3.02%)
SEARL 59.12 Decreased By ▼ -0.75 (-1.25%)
SNGP 69.50 Decreased By ▼ -0.56 (-0.8%)
SSGC 10.33 Decreased By ▼ -0.02 (-0.19%)
TELE 8.50 Decreased By ▼ -0.04 (-0.47%)
TPLP 11.23 Decreased By ▼ -0.11 (-0.97%)
TRG 64.85 Decreased By ▼ -1.15 (-1.74%)
UNITY 26.25 Decreased By ▼ -0.08 (-0.3%)
WTL 1.34 Decreased By ▼ -0.01 (-0.74%)
BR100 7,851 Increased By 26.3 (0.34%)
BR30 25,337 Decreased By -69.2 (-0.27%)
KSE100 75,207 Increased By 122.8 (0.16%)
KSE30 24,143 Increased By 49.1 (0.2%)

ISLAMABAD: Pakistan Railways has rehabilitated and reconstructed around 230 bridges across the country to ensure smooth trains operation besides reducing the travel duration.

“Around 86 percent of railways bridges are more than 100 years old but all bridges are safe for train operation due to effective maintenance owing to regular maintenance, rehabilitation and strengthening of these bridges,” an official in the Ministry of Railways told APP.

He said there are 13,959 major and minor bridges over the system and the design life of which varies for different years.

The Standard Operating Procedure for inspection of bridges in accordance with the different schedules like monthly, quarterly, biannually and annually. The official said average 77.10 percent of track is over-aged and minor repair are carried out departmentally in routine to ensure safety of the passengers.

However, he said 730 kilometers track has been rehabilitated or partially rehabilitated through complete track renewal, sleeper renewal and rail renewal under different PSDP projects.

To a question, the official said Pakistan Railways has finalized a plan to upgrade its track from Karachi-Peshawar via Lahore in the next five years under China Pakistan Economic Corridor project.

He said Pakistan Railways track from Lahore - Peshawar via Rawalpindi will be dialyzes in the next five years.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed.