AIRLINK 76.15 Increased By ▲ 1.75 (2.35%)
BOP 4.86 Decreased By ▼ -0.09 (-1.82%)
CNERGY 4.31 Decreased By ▼ -0.03 (-0.69%)
DFML 46.65 Increased By ▲ 1.92 (4.29%)
DGKC 89.25 Increased By ▲ 1.98 (2.27%)
FCCL 23.48 Increased By ▲ 0.58 (2.53%)
FFBL 33.36 Increased By ▲ 1.71 (5.4%)
FFL 9.35 Decreased By ▼ -0.01 (-0.11%)
GGL 10.10 No Change ▼ 0.00 (0%)
HASCOL 6.66 Decreased By ▼ -0.11 (-1.62%)
HBL 113.77 Increased By ▲ 0.17 (0.15%)
HUBC 143.90 Increased By ▲ 3.75 (2.68%)
HUMNL 11.85 Decreased By ▼ -0.06 (-0.5%)
KEL 4.99 Increased By ▲ 0.12 (2.46%)
KOSM 4.40 No Change ▼ 0.00 (0%)
MLCF 38.50 Increased By ▲ 0.10 (0.26%)
OGDC 133.70 Increased By ▲ 0.90 (0.68%)
PAEL 25.39 Increased By ▲ 0.94 (3.84%)
PIBTL 6.75 Increased By ▲ 0.22 (3.37%)
PPL 120.01 Increased By ▲ 0.37 (0.31%)
PRL 26.16 Increased By ▲ 0.28 (1.08%)
PTC 13.89 Increased By ▲ 0.14 (1.02%)
SEARL 57.50 Increased By ▲ 0.25 (0.44%)
SNGP 66.30 Decreased By ▼ -0.10 (-0.15%)
SSGC 10.10 Decreased By ▼ -0.05 (-0.49%)
TELE 8.10 Increased By ▲ 0.15 (1.89%)
TPLP 10.61 Decreased By ▼ -0.03 (-0.28%)
TRG 62.80 Increased By ▲ 1.14 (1.85%)
UNITY 26.95 Increased By ▲ 0.32 (1.2%)
WTL 1.34 Decreased By ▼ -0.02 (-1.47%)
BR100 7,957 Increased By 122.2 (1.56%)
BR30 25,700 Increased By 369.8 (1.46%)
KSE100 75,878 Increased By 1000.4 (1.34%)
KSE30 24,343 Increased By 355.2 (1.48%)

imageISLAMABAD: Qatari and Chinese companies will jointly install four coal-based power plants at Gaddani (Balochistan) and Port Qasim, generating a total of 2,600 megawatts cheap electricity in Pakistan.

Prime Minister Muhammad Nawaz Sharif welcomed the investment in energy sector during a meeting with the Qatari and Chinese delegations, which called on him here at the Prime Minister House on Tuesday

The Prime Minister said that two projects, each one of 660 MW, would be set up at Gaddani and two at Port Qasim.

Welcoming the Qatari and Chinese delegations, the Prime Minister expressed his pleasure over foreign investment in power projects in Pakistan, which is facing acute energy crisis and the completion of these projects, he said, would go a long way to overcome the problem.

The Prime Minister said that for the time being imported coal would be used in the projects till Pakistan's coal was ready for mining.

He assured the delegations that the government would provide full assistance in commissioning of the projects.

Comments

Comments are closed.