AIRLINK 75.25 Decreased By ▼ -0.18 (-0.24%)
BOP 5.11 Increased By ▲ 0.04 (0.79%)
CNERGY 4.60 Decreased By ▼ -0.15 (-3.16%)
DFML 32.53 Increased By ▲ 2.43 (8.07%)
DGKC 90.35 Decreased By ▼ -0.13 (-0.14%)
FCCL 22.98 Increased By ▲ 0.08 (0.35%)
FFBL 33.57 Increased By ▲ 0.62 (1.88%)
FFL 10.04 Decreased By ▼ -0.01 (-0.1%)
GGL 11.05 Decreased By ▼ -0.29 (-2.56%)
HBL 114.90 Increased By ▲ 1.41 (1.24%)
HUBC 137.34 Increased By ▲ 0.83 (0.61%)
HUMNL 9.53 Decreased By ▼ -0.37 (-3.74%)
KEL 4.66 No Change ▼ 0.00 (0%)
KOSM 4.70 Increased By ▲ 0.01 (0.21%)
MLCF 40.54 Decreased By ▼ -0.56 (-1.36%)
OGDC 139.75 Increased By ▲ 4.95 (3.67%)
PAEL 27.65 Increased By ▲ 0.04 (0.14%)
PIAA 24.40 Decreased By ▼ -1.07 (-4.2%)
PIBTL 6.92 No Change ▼ 0.00 (0%)
PPL 125.30 Increased By ▲ 0.85 (0.68%)
PRL 27.55 Increased By ▲ 0.15 (0.55%)
PTC 14.15 Decreased By ▼ -0.35 (-2.41%)
SEARL 61.85 Increased By ▲ 1.65 (2.74%)
SNGP 72.98 Increased By ▲ 2.43 (3.44%)
SSGC 10.59 Increased By ▲ 0.03 (0.28%)
TELE 8.78 Decreased By ▼ -0.11 (-1.24%)
TPLP 11.73 Decreased By ▼ -0.05 (-0.42%)
TRG 66.60 Decreased By ▼ -1.06 (-1.57%)
UNITY 25.15 Decreased By ▼ -0.02 (-0.08%)
WTL 1.44 Decreased By ▼ -0.04 (-2.7%)
BR100 7,806 Increased By 81.8 (1.06%)
BR30 25,828 Increased By 227.1 (0.89%)
KSE100 74,531 Increased By 732.1 (0.99%)
KSE30 23,954 Increased By 330.7 (1.4%)

asim-hussain ISLAMABAD: Advisor to the Prime Minister on Petroleum and Natural Resources Dr. Asim Hussain has said that efforts are being made to insert additional gas into the system from various sources, including new discoveries, abandoned fields, marginal gases and flared gases.

 

He was chairing a meeting on abandoned, marginal and flared gases, which was attended by Secretary Petroleum, managing directors of the OGDCL and the PPL, Additional Secretary (Petroleum), Director General (Petroleum Concessions) and representatives of Pakistan Petroleum Exploration and Production Companies Association (PPEPCA).

 

Discussions were held on criteria, zonal distribution and pricing of gas from abandoned fields, marginal gases and flared gases.

 

Dr Asim Hussain directed that all-out efforts be made to prepare policy and guidelines for these gases so that additional gas was inserted into the system.

 

An expected 200 MMCFD gas is estimated to be added from these sources, he added.

 

Meanwhile, in a meeting with Luiqi Ciarrocchi, Vice President (Asia Pacific) ENI S.P.A, Dr. Asim Hussain said that the new Petroleum and Exploration Policy 2012 provided investor friendly opportunities to foreign oil and gas companies.

 

Luiqi thanked the Advisor for facilitation provided by the ministry to the ENI regarding its operations in Pakistan.

 

The Advisor said that several exploration blocks had been offered and invited the ENI to participate in the bidding process.

 

The Advisor was informed that three Shale gas pilot projects were being planned and wells would be drilled within 2013.

 

The three projects would require approximately 1100 wells, compared to 1850 drilled in the whole country till date entailing an investment of $ 10 billion.

 

Copyright APP (Associated Press of Pakistan), 2012

Comments

Comments are closed.