AIRLINK 74.00 Decreased By ▼ -0.25 (-0.34%)
BOP 5.14 Increased By ▲ 0.09 (1.78%)
CNERGY 4.55 Increased By ▲ 0.13 (2.94%)
DFML 37.15 Increased By ▲ 1.31 (3.66%)
DGKC 89.90 Increased By ▲ 1.90 (2.16%)
FCCL 22.40 Increased By ▲ 0.20 (0.9%)
FFBL 33.03 Increased By ▲ 0.31 (0.95%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 10.75 Decreased By ▼ -0.05 (-0.46%)
HBL 115.50 Decreased By ▼ -0.40 (-0.35%)
HUBC 137.10 Increased By ▲ 1.26 (0.93%)
HUMNL 9.95 Increased By ▲ 0.11 (1.12%)
KEL 4.60 Decreased By ▼ -0.01 (-0.22%)
KOSM 4.83 Increased By ▲ 0.17 (3.65%)
MLCF 39.75 Decreased By ▼ -0.13 (-0.33%)
OGDC 138.20 Increased By ▲ 0.30 (0.22%)
PAEL 27.00 Increased By ▲ 0.57 (2.16%)
PIAA 24.24 Decreased By ▼ -2.04 (-7.76%)
PIBTL 6.74 Decreased By ▼ -0.02 (-0.3%)
PPL 123.62 Increased By ▲ 0.72 (0.59%)
PRL 27.40 Increased By ▲ 0.71 (2.66%)
PTC 13.90 Decreased By ▼ -0.10 (-0.71%)
SEARL 61.75 Increased By ▲ 3.05 (5.2%)
SNGP 70.15 Decreased By ▼ -0.25 (-0.36%)
SSGC 10.52 Increased By ▲ 0.16 (1.54%)
TELE 8.57 Increased By ▲ 0.01 (0.12%)
TPLP 11.10 Decreased By ▼ -0.28 (-2.46%)
TRG 64.02 Decreased By ▼ -0.21 (-0.33%)
UNITY 26.76 Increased By ▲ 0.71 (2.73%)
WTL 1.38 No Change ▼ 0.00 (0%)
BR100 7,874 Increased By 36.2 (0.46%)
BR30 25,596 Increased By 136 (0.53%)
KSE100 75,342 Increased By 411.7 (0.55%)
KSE30 24,214 Increased By 68.6 (0.28%)

ISLAMABAD: Pakistan Railways has planned to dualize the Railway track between Lahore to Peshawar via Rawalpindi under China Pakistan Economic corridor (CPEC) in next five years.

An official of Ministry of Railways told APP that the Main Line-1 (ML-I) from Karachi to Peshawar via Lahore would be upgraded under China-Pak Economic Corridor (CPEC) which includes up-gradation of the entire railway line.

However, around 789 kilometer track has been rehabilitated/partially rehabilitated through complete track renewal, sleeper renewal and rail renewal under different Public Sector Development Programme (PSDP) projects, he said that Pakistan Railways has rehabilitated the tracks by removing temporary speed restrictions and increasing speeds for ensuring sustainable train operation across the country.

“The rehabilitation work was carried on its 14 different routes in the four provinces, under various Public Sector Development Programme (PSDP) projects,” he added.

Giving provinces wise detail of the rehabilitated track, he said 397.05 km track has already been rehabilitated in Punjab, 215.60 km in Sindh, 23.69 km in Khyber Pakhtunkhwa and 153.00 km in Balochistan.

The routes included Karachi-Hyderabad, Kotri-Dadu, Dera Murad Jamali-Sibi, Khanpur-Multan, Lodhran-Pakpattan, Faisalabad-Sheikhupura, Multan-Lahore, Lahore-Lalamusa, Peshawar-Attock City, Islamabad-Rawalpindi, Multan-Kot Addu, Kot Addu-Mianwali, Sibi-Khost and Hyderabad-Rohri- Khanpur, he added.

To a question, he said that restoration of 134 km long track and other allied works on Sibi-Khost line was nearing completion.

He said that Quetta-Taftan section is part of ML-III and feasibility study for its up-gradation at a speed of 160/120 KMH is under process which will be completed soon.

“This section has been earmarked for up-gradation under public and private partnership on build–operate–transfer (BOT) basis as well,” the official added.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed.