AIRLINK 72.80 Decreased By ▼ -1.30 (-1.75%)
BOP 5.03 Increased By ▲ 0.03 (0.6%)
CNERGY 4.30 Decreased By ▼ -0.04 (-0.92%)
DFML 29.35 Decreased By ▼ -0.19 (-0.64%)
DGKC 82.35 Decreased By ▼ -1.20 (-1.44%)
FCCL 22.26 Decreased By ▼ -0.17 (-0.76%)
FFBL 34.24 Decreased By ▼ -0.66 (-1.89%)
FFL 10.11 Increased By ▲ 0.24 (2.43%)
GGL 10.03 Increased By ▲ 0.03 (0.3%)
HBL 111.60 Decreased By ▼ -0.40 (-0.36%)
HUBC 138.10 Increased By ▲ 0.41 (0.3%)
HUMNL 7.20 Increased By ▲ 0.22 (3.15%)
KEL 4.35 Decreased By ▼ -0.05 (-1.14%)
KOSM 4.54 Decreased By ▼ -0.05 (-1.09%)
MLCF 38.18 Decreased By ▼ -0.37 (-0.96%)
OGDC 134.75 Decreased By ▼ -1.85 (-1.35%)
PAEL 26.24 Increased By ▲ 1.10 (4.38%)
PIAA 26.50 Decreased By ▼ -0.01 (-0.04%)
PIBTL 6.60 Decreased By ▼ -0.05 (-0.75%)
PPL 123.00 Decreased By ▼ -2.40 (-1.91%)
PRL 27.93 Decreased By ▼ -0.28 (-0.99%)
PTC 13.78 Decreased By ▼ -0.52 (-3.64%)
SEARL 53.57 Decreased By ▼ -1.03 (-1.89%)
SNGP 70.03 Decreased By ▼ -1.17 (-1.64%)
SSGC 10.47 Decreased By ▼ -0.03 (-0.29%)
TELE 8.40 Decreased By ▼ -0.12 (-1.41%)
TPLP 10.90 Decreased By ▼ -0.04 (-0.37%)
TRG 60.20 Decreased By ▼ -0.50 (-0.82%)
UNITY 25.26 Decreased By ▼ -0.07 (-0.28%)
WTL 1.26 No Change ▼ 0.00 (0%)
BR100 7,617 Decreased By -47.7 (-0.62%)
BR30 24,833 Decreased By -192.4 (-0.77%)
KSE100 72,740 Decreased By -24.7 (-0.03%)
KSE30 23,660 Decreased By -115.9 (-0.49%)
Pakistan

Tarbela 4th extension to generate additional 1,350 MW

ISLAMABAD : Additional 1,350 MW electricity will be generated from Tarbela hydropower station under 4th extension projec
Published May 29, 2011

tarbelaISLAMABAD: Additional 1,350 MW electricity will be generated from Tarbela hydropower station under 4th extension project which will cost $ 700 million.

The total generation capacity of the Tarbela Hydropower Station will go up to 4,828 megawatt, official sources told APP here.

They said, "an estimated amount of US dollar 700 million will be spent on the project for which World Bank is supporting."

Engineering consultants have reached Pakistan for the fourth Tarbela extension project which would be completed in four years, they said.

The sources said three turbines of 450MW each would be installed instead of two turbines of 480MW each, as envisaged in a study conducted earlier in 90s.

They said work on detailed engineering design, preparation of tender documents and PC-1 of the extension project is expected to be completed by September 2011.

They said," development work is also underway on 969 MW Neelum-Jhelum project which will be completed in seven years".

They said 10 km tunnel had been constructed at the project site.

Copyright AFP (Agence France-Presse), 2011

Comments

Comments are closed.