AIRLINK 71.69 Decreased By ▼ -2.41 (-3.25%)
BOP 5.00 No Change ▼ 0.00 (0%)
CNERGY 4.39 Increased By ▲ 0.05 (1.15%)
DFML 28.55 Decreased By ▼ -0.99 (-3.35%)
DGKC 82.40 Decreased By ▼ -1.15 (-1.38%)
FCCL 21.95 Decreased By ▼ -0.48 (-2.14%)
FFBL 34.15 Decreased By ▼ -0.75 (-2.15%)
FFL 10.08 Increased By ▲ 0.21 (2.13%)
GGL 10.12 Increased By ▲ 0.12 (1.2%)
HBL 113.00 Increased By ▲ 1.00 (0.89%)
HUBC 140.50 Increased By ▲ 2.81 (2.04%)
HUMNL 8.03 Increased By ▲ 1.05 (15.04%)
KEL 4.38 Decreased By ▼ -0.02 (-0.45%)
KOSM 4.50 Decreased By ▼ -0.09 (-1.96%)
MLCF 38.01 Decreased By ▼ -0.54 (-1.4%)
OGDC 134.69 Decreased By ▼ -1.91 (-1.4%)
PAEL 26.62 Increased By ▲ 1.48 (5.89%)
PIAA 25.40 Decreased By ▼ -1.11 (-4.19%)
PIBTL 6.55 Decreased By ▼ -0.10 (-1.5%)
PPL 121.95 Decreased By ▼ -3.45 (-2.75%)
PRL 27.73 Decreased By ▼ -0.48 (-1.7%)
PTC 13.80 Decreased By ▼ -0.50 (-3.5%)
SEARL 54.89 Increased By ▲ 0.29 (0.53%)
SNGP 69.70 Decreased By ▼ -1.50 (-2.11%)
SSGC 10.40 Decreased By ▼ -0.10 (-0.95%)
TELE 8.50 Decreased By ▼ -0.02 (-0.23%)
TPLP 10.95 Increased By ▲ 0.01 (0.09%)
TRG 60.90 Increased By ▲ 0.20 (0.33%)
UNITY 25.22 Decreased By ▼ -0.11 (-0.43%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)
BR100 7,619 Decreased By -45.8 (-0.6%)
BR30 24,969 Decreased By -56.1 (-0.22%)
KSE100 72,761 Decreased By -3 (-0%)
KSE30 23,625 Decreased By -150.3 (-0.63%)

STOCKHOLM: Cavotec's automated mooring technology, MoorMasterTM, has been selected by Australian mining company, Karara Mining Ltd., for use at their dedicated iron ore handling facility at the Port of Geraldton in Western Australia.

"Safety and sea conditions are the two major considerations with this project; issues that MoorMasterTM is uniquely equipped to handle. Cavotec looks forward to working closely with Karara to ensure the successful execution of this project," says Cavotec CEO, Ottonel Popesco.

Karara Mining Ltd. has ordered 12 MoorMasterTM MM200D units, for use at their dedicated bulk handling facility at the Port of Geraldton to minimise the serious safety risk of mooring lines parting. All MoorMasterTM MM200D units are specially designed for use at bulk terminals.

Situated some 400km north of Perth, the Port of Geraldton is one of Australia's busiest regional ports. The Port has historically been one of Australia's larger grain export ports and today, more than half the port's exports are generated from minerals and iron ore.

MoorMasterTM is a vacuum-based automated mooring technology that eliminates the need for conventional mooring lines. Remote controlled vacuum pads recessed in, or mounted on, the quayside, moor and release vessels in seconds. The system offers improved safety, improved operational efficiency and the potential for infrastructure savings.

MoorMasterTM is also in use at two other bulk handling applications in Western Australia. Fourteen MoorMasterTM MM200B units have recently been commissioned at the Port Hedland Port Authority, and Cavotec has recently delivered eight MM200D units to Hamersley Iron Pty Ltd, a subsidiary of Anglo-Australian mining group Rio Tinto, for the Dampier Fuel Supply Wharf in the Port of Dampier.

MoorMasterTM is an increasingly accepted and widely adopted technology that has performed more than 40,000 mooring operations, with a 100% safety record, at ferry, bulk handling, Ro-Ro, container and lock applications around the world.

Cavotec is a leading global engineering group, developing innovative technologies that enable the maritime, airports; mining and tunnelling, and general industry sectors operate more sustainably.

Copyright AFP (Agence France-Presse), 2011

Comments

Comments are closed.