AIRLINK 73.42 Increased By ▲ 0.62 (0.85%)
BOP 4.99 Decreased By ▼ -0.07 (-1.38%)
CNERGY 4.36 Increased By ▲ 0.03 (0.69%)
DFML 29.79 Decreased By ▼ -0.73 (-2.39%)
DGKC 90.25 Increased By ▲ 4.30 (5%)
FCCL 22.90 Increased By ▲ 0.55 (2.46%)
FFBL 33.70 Increased By ▲ 0.48 (1.44%)
FFL 9.86 Increased By ▲ 0.08 (0.82%)
GGL 10.44 Increased By ▲ 0.04 (0.38%)
HBL 113.49 Decreased By ▼ -0.13 (-0.11%)
HUBC 137.30 Increased By ▲ 1.10 (0.81%)
HUMNL 9.64 Decreased By ▼ -0.39 (-3.89%)
KEL 4.72 Increased By ▲ 0.06 (1.29%)
KOSM 4.81 Increased By ▲ 0.41 (9.32%)
MLCF 39.62 Increased By ▲ 1.27 (3.31%)
OGDC 135.25 Increased By ▲ 1.85 (1.39%)
PAEL 28.57 Increased By ▲ 1.17 (4.27%)
PIAA 24.80 Increased By ▲ 0.04 (0.16%)
PIBTL 6.97 Increased By ▲ 0.42 (6.41%)
PPL 123.20 Increased By ▲ 1.99 (1.64%)
PRL 27.17 Increased By ▲ 0.02 (0.07%)
PTC 14.60 Increased By ▲ 0.71 (5.11%)
SEARL 59.57 Decreased By ▼ -0.83 (-1.37%)
SNGP 69.24 Increased By ▲ 0.71 (1.04%)
SSGC 10.42 Increased By ▲ 0.09 (0.87%)
TELE 9.00 Decreased By ▼ -0.05 (-0.55%)
TPLP 11.59 Increased By ▲ 0.33 (2.93%)
TRG 67.16 Increased By ▲ 1.46 (2.22%)
UNITY 25.25 No Change ▼ 0.00 (0%)
WTL 1.55 Increased By ▲ 0.05 (3.33%)
BR100 7,708 Increased By 74.3 (0.97%)
BR30 25,555 Increased By 383.1 (1.52%)
KSE100 73,266 Increased By 608 (0.84%)
KSE30 23,546 Increased By 163.2 (0.7%)

imageISLAMABAD: Pakistan Railways (PR) has rehabilitated 66 bridges out of 159 and remaining would be rehabilitated upto June 2017.

The Railway administration desires to provide quick and safe journey to the travelling public within shortest possible time, official sources in the Ministry of Railways told APP.

"There are 13841 bridges including 532 major and 13309 minor bridges over the system. Most of the bridges were constructed well before partition, when Railway System was introduced in the subcontinent and have completed their useful life, the sources added.

They said that due to dedicated inspections and regular maintenance, bridges are generally in satisfactory condition for safe train operation.

In rehabilitation of flood damages, out of 69 bridges, 16 have been completed and remaining will be completed upto June 2017, the sources added.

They said the rehabilitation bridges will ensure safety standards, remove speed restrictions imposed on weak bridges, ensure effective maintenance in reducing the operational cost and meet the increased requirements of freight and passengers.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.