BR100 Decreased By (-0.04%)
BR30 Increased By (0.11%)
KSE100 Decreased By (-0.05%)
KSE30 Decreased By (-0.1%)
AGHA 7.35 Decreased By ▼ -0.21 (-2.78%)
BECO 5.11 Increased By ▲ 0.02 (0.39%)
BML 56.10 Increased By ▲ 1.12 (2.04%)
BOP 32.79 Decreased By ▼ -0.19 (-0.58%)
CNERGY 10.32 Increased By ▲ 0.22 (2.18%)
CSIL 5.08 Decreased By ▼ -0.05 (-0.97%)
FCCL 52.09 Increased By ▲ 0.84 (1.64%)
FFL 16.30 Increased By ▲ 0.12 (0.74%)
FNEL 1.20 Increased By ▲ 0.01 (0.84%)
KEL 7.15 Increased By ▲ 0.09 (1.27%)
KOSM 5.98 Increased By ▲ 0.44 (7.94%)
LOTCHEM 26.93 Decreased By ▼ -2.19 (-7.52%)
MLCF 89.60 Increased By ▲ 0.78 (0.88%)
NBP 195.24 Decreased By ▼ -2.25 (-1.14%)
NCPL 55.50 Increased By ▲ 0.48 (0.87%)
NPL 64.57 Decreased By ▼ -0.31 (-0.48%)
OGDC 312.38 Increased By ▲ 0.43 (0.14%)
PACE 10.35 Increased By ▲ 0.14 (1.37%)
PAEL 40.61 Decreased By ▼ -0.38 (-0.93%)
PIBTL 15.95 Decreased By ▼ -0.01 (-0.06%)
PPL 212.70 Increased By ▲ 0.04 (0.02%)
PRL 53.50 Increased By ▲ 0.96 (1.83%)
PTC 68.60 Decreased By ▼ -0.48 (-0.69%)
SSGC 24.78 Decreased By ▼ -0.32 (-1.27%)
TBL 9.50 Decreased By ▼ -0.12 (-1.25%)
TELE 8.33 Increased By ▲ 0.01 (0.12%)
TPL 18.15 Increased By ▲ 0.40 (2.25%)
TPLP 12.95 Decreased By ▼ -0.27 (-2.04%)
TREET 21.44 Decreased By ▼ -0.30 (-1.38%)
TRG 59.49 Increased By ▲ 2.60 (4.57%)
Pakistan

Meeting reviews progress work on 46 energy projects in KP

PESHAWAR: A meeting of the Energy and Power Department here Thursday reviewed annual development plan of the departm
Published Updated

PESHAWAR: A meeting of the Energy and Power Department here Thursday reviewed annual development plan of the department and obtained briefing on 46 different hydropower projects underway in the Khyber Pakthunkhwa province.

Advisor to the chief minister on Power and Energy Hamayatullah Khan chaired the meeting which was also attended by secretary energy and power Engr Sarfaraz Durrani, Additional Secretary Zafarul Islam, Chief Executive Officer PEDO, Zainullah Khan, General Manager Bahadar Shah and Project Directors of hydropower projects.

The meeting held detailed deliberations on 46 hydropower projects including 35 ongoing and 11 new projects.

The PEDO chief briefed the meeting in details about expenditure and generation capacity of the projects which included hydropower projects Shangla, Growcan Hydropower Project Swat, 40MW hydropower project Lower Dir, 69MW under construction project Chitral and some projects in Mansehra.

The advisor Hayatullah Khan said Khyber Pakhtunkhwa government was completing electricity and energy projects on fast track and therefore no leniency would be tolerated in this regard.

Secretary Energy and Power Engr Sarfarz said monitoring and evolution system would be further strengthened so that performance on various projects could easily ascertained.

Copyright APP (Associated Press of Pakistan), 2019

Comments

Comments are closed for this article.