BR100 Decreased By (-0.36%)
BR30 Decreased By (-0.72%)
KSE100 Decreased By (-0.33%)
KSE30 Decreased By (-0.31%)
AGHA 6.59 Decreased By ▼ -0.08 (-1.2%)
BECO 4.41 Increased By ▲ 0.06 (1.38%)
BML 55.20 Decreased By ▼ -0.97 (-1.73%)
BOP 29.95 Decreased By ▼ -0.17 (-0.56%)
CNERGY 12.69 Decreased By ▼ -0.29 (-2.23%)
CSIL 5.23 Decreased By ▼ -0.08 (-1.51%)
FCCL 51.50 Decreased By ▼ -0.15 (-0.29%)
FFL 14.43 Decreased By ▼ -0.06 (-0.41%)
FNEL 1.19 Decreased By ▼ -0.02 (-1.65%)
KEL 5.97 Decreased By ▼ -0.09 (-1.49%)
KOSM 5.62 Decreased By ▼ -0.22 (-3.77%)
LOTCHEM 26.25 Increased By ▲ 0.08 (0.31%)
MLCF 90.75 Decreased By ▼ -0.48 (-0.53%)
NBP 162.28 Decreased By ▼ -1.91 (-1.16%)
NCPL 52.58 Decreased By ▼ -0.60 (-1.13%)
NPL 58.07 Decreased By ▼ -1.05 (-1.78%)
OGDC 314.50 Increased By ▲ 1.11 (0.35%)
PACE 9.68 Decreased By ▼ -0.09 (-0.92%)
PAEL 34.95 Decreased By ▼ -0.29 (-0.82%)
PIBTL 14.24 Decreased By ▼ -0.47 (-3.2%)
PPL 219.90 Decreased By ▼ -1.46 (-0.66%)
PRL 89.80 Decreased By ▼ -1.42 (-1.56%)
PTC 59.00 Decreased By ▼ -0.19 (-0.32%)
SSGC 23.27 Decreased By ▼ -0.03 (-0.13%)
TBL 8.68 Decreased By ▼ -0.07 (-0.8%)
TELE 7.39 Decreased By ▼ -0.22 (-2.89%)
TPL 21.17 Decreased By ▼ -0.86 (-3.9%)
TPLP 12.18 Decreased By ▼ -0.38 (-3.03%)
TREET 21.37 Decreased By ▼ -0.36 (-1.66%)
TRG 54.43 Decreased By ▼ -1.36 (-2.44%)

BAHAWALPUR: Sui Northern Gas Pipeline Limited (SNGPL) Regional Manager Malik Bashir Ahmed Tuesday said long term steps are being taken to improve gas pressure across Bahawalpur division.

Talking to reporters, he said a project is underway to replace a 11-inch pipeline from Khairpur Daha to Bahawalpur with 16-inch.

A huge amount would be spent on the 49-kilometre pipeline project and complaints of low pressure during the winter season would also be addressed, he added.

He said Ahmedpur Road Chowk Bhatta No1 to Model Town B, Model Town C to General Bus Stand 4-inch wide pipeline will be replaced with 8-inch line. On the replacing of the 4.5 kilometre long pipeline, around Rs80 million will be spent, he said.

With the change of the line, Shahdra, Kausar Colony, Model Town B, Model Town C and its adjoining areas will have sufficient pressure of gas, he said.

He said current pipeline with 4-inch of width was not enough for the needs, he said and added the project would start from December this year.

He said the process of changing the pipelines throughout the city was in progress. He said it would reduce the line losses and rectify the complaints of low pressure.

He said replacing of pipelines in Model Town B had been completed. He further said bribe and intercession culture in SNGPL matters had been finished and now every task is being done on merit.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed for this article.