BR100 Decreased By (-0.25%)
BR30 Decreased By (-0.64%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.83 Decreased By ▼ -0.20 (-3.32%)
BML 57.90 Increased By ▲ 5.15 (9.76%)
BOP 33.79 Decreased By ▼ -0.46 (-1.34%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.79 Decreased By ▼ -0.55 (-4.46%)
FCCL 53.49 Decreased By ▼ -0.40 (-0.74%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.84 Decreased By ▼ -0.19 (-1.05%)
FNEL 1.30 No Change ▼ 0.00 (0%)
HUMNL 11.11 Increased By ▲ 0.11 (1%)
KEL 8.02 Decreased By ▼ -0.09 (-1.11%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.40 Decreased By ▼ -0.65 (-0.74%)
NBP 184.24 Decreased By ▼ -2.24 (-1.2%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.25 Increased By ▲ 0.31 (0.78%)
PIAHCLA 26.12 Decreased By ▼ -0.05 (-0.19%)
PIBTL 17.14 Decreased By ▼ -0.18 (-1.04%)
PPL 228.73 Decreased By ▼ -4.05 (-1.74%)
PRL 34.49 Decreased By ▼ -0.46 (-1.32%)
PTC 67.54 Decreased By ▼ -0.02 (-0.03%)
SEARL 90.93 No Change ▼ 0.00 (0%)
SSGC 26.83 Decreased By ▼ -0.34 (-1.25%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.33 Increased By ▲ 0.57 (6.51%)
TREET 24.51 Decreased By ▼ -0.03 (-0.12%)
TRG 71.61 Decreased By ▼ -0.14 (-0.2%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)

imageISLAMABAD: Pakistan Railways has decided to conduct a fresh feasibility study for connecting Dera Ismail Khan with Quetta under Medium Term Development Framework (2020-25) of China-Pakistan Economic Corridor (CPEC).

According to official documents, the fresh input/Terms of Reference (TORs) are being prepared for implementation of the project.

The connectivity of Dera Ismail Khan with Quetta is a part of future Railways Development Plan. The proposed route, 538 Km in length will connect Quetta with DI Khan via Bostan and Zhob, the documents added.

Giving details of the route, it said, Quetta-Bostan was 33 Km, Bostan to Zhob via Muslim, Bagh-Qila Saif-Ullah 295 Km, Zhob-DI Khan 185 km and DI Khan-Kotla Jam (near Bhakkar) 25 Km.

It is pertinent to mention here that the feasibility study of the project was carried out during 2006-07. Linking this route will develop far flung areas of Khyber Pakhtunkhwa and Balochistan.

With the completion of this route the distance from Quetta to Peshawar will be reduced 670 km as compared to Main Line-I (from Quetta to Peshawar).

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.