AIRLINK 74.64 Decreased By ▼ -0.21 (-0.28%)
BOP 5.01 Increased By ▲ 0.03 (0.6%)
CNERGY 4.51 Increased By ▲ 0.02 (0.45%)
DFML 42.44 Increased By ▲ 2.44 (6.1%)
DGKC 87.02 Increased By ▲ 0.67 (0.78%)
FCCL 21.58 Increased By ▲ 0.22 (1.03%)
FFBL 33.54 Decreased By ▼ -0.31 (-0.92%)
FFL 9.66 Decreased By ▼ -0.06 (-0.62%)
GGL 10.43 Decreased By ▼ -0.02 (-0.19%)
HBL 114.29 Increased By ▲ 1.55 (1.37%)
HUBC 139.94 Increased By ▲ 2.50 (1.82%)
HUMNL 12.25 Increased By ▲ 0.83 (7.27%)
KEL 5.21 Decreased By ▼ -0.07 (-1.33%)
KOSM 4.50 Decreased By ▼ -0.13 (-2.81%)
MLCF 38.09 Increased By ▲ 0.29 (0.77%)
OGDC 139.16 Decreased By ▼ -0.34 (-0.24%)
PAEL 25.87 Increased By ▲ 0.26 (1.02%)
PIAA 22.20 Increased By ▲ 1.52 (7.35%)
PIBTL 6.80 No Change ▼ 0.00 (0%)
PPL 123.58 Increased By ▲ 1.38 (1.13%)
PRL 26.81 Increased By ▲ 0.23 (0.87%)
PTC 14.01 Decreased By ▼ -0.04 (-0.28%)
SEARL 58.53 Decreased By ▼ -0.45 (-0.76%)
SNGP 68.01 Decreased By ▼ -0.94 (-1.36%)
SSGC 10.47 Increased By ▲ 0.17 (1.65%)
TELE 8.39 Increased By ▲ 0.01 (0.12%)
TPLP 11.05 Decreased By ▼ -0.01 (-0.09%)
TRG 63.21 Decreased By ▼ -0.98 (-1.53%)
UNITY 26.59 Increased By ▲ 0.04 (0.15%)
WTL 1.42 Decreased By ▼ -0.03 (-2.07%)
BR100 7,941 Increased By 103.5 (1.32%)
BR30 25,648 Increased By 196 (0.77%)
KSE100 75,983 Increased By 868.6 (1.16%)
KSE30 24,445 Increased By 330.8 (1.37%)

imageACCRA: Tullow Oil Plc will shut production at Ghana's Jubilee offshore oil field on September 20 for three weeks of maintenance on an $800 million processing and storage vessel, the company said on Monday.

Tullow said in its second quarter results maintenance would take place during the third quarter but did not give a date. It began production in December 2010 from the field, which has estimated reserves up to 1 billion barrels.

It expects 2013 full year production at 95,000 barrels per day down in part because of the shutdown from 104,000 for the year's first half.

Thomas Manu, general manager at state-run Ghana National Petroleum Corporation (GNPC), said the shutdown will be the first major interruption since production began.

"It is a planned shutdown which has been scheduled to enable us to undertake mandatory service work on the FPSO (Floating, Production, Storage and Offloading)," he said.

.

Comments

Comments are closed.