BR100 Decreased By (-0.4%)
BR30 Decreased By (-0.65%)
KSE100 Decreased By (-0.29%)
KSE30 Decreased By (-0.22%)
AGHA 6.56 Decreased By ▼ -0.11 (-1.65%)
BECO 4.40 Increased By ▲ 0.05 (1.15%)
BML 55.89 Decreased By ▼ -0.28 (-0.5%)
BOP 30.05 Decreased By ▼ -0.07 (-0.23%)
CNERGY 12.75 Decreased By ▼ -0.23 (-1.77%)
CSIL 5.21 Decreased By ▼ -0.10 (-1.88%)
FCCL 51.00 Decreased By ▼ -0.65 (-1.26%)
FFL 14.43 Decreased By ▼ -0.06 (-0.41%)
FNEL 1.22 Increased By ▲ 0.01 (0.83%)
KEL 5.97 Decreased By ▼ -0.09 (-1.49%)
KOSM 5.58 Decreased By ▼ -0.26 (-4.45%)
LOTCHEM 26.15 Decreased By ▼ -0.02 (-0.08%)
MLCF 90.33 Decreased By ▼ -0.90 (-0.99%)
NBP 161.45 Decreased By ▼ -2.74 (-1.67%)
NCPL 52.55 Decreased By ▼ -0.63 (-1.18%)
NPL 57.98 Decreased By ▼ -1.14 (-1.93%)
OGDC 315.40 Increased By ▲ 2.01 (0.64%)
PACE 9.70 Decreased By ▼ -0.07 (-0.72%)
PAEL 34.73 Decreased By ▼ -0.51 (-1.45%)
PIBTL 14.23 Decreased By ▼ -0.48 (-3.26%)
PPL 221.00 Decreased By ▼ -0.36 (-0.16%)
PRL 90.89 Decreased By ▼ -0.33 (-0.36%)
PTC 59.25 Increased By ▲ 0.06 (0.1%)
SSGC 23.39 Increased By ▲ 0.09 (0.39%)
TBL 8.65 Decreased By ▼ -0.10 (-1.14%)
TELE 7.40 Decreased By ▼ -0.21 (-2.76%)
TPL 21.00 Decreased By ▼ -1.03 (-4.68%)
TPLP 12.02 Decreased By ▼ -0.54 (-4.3%)
TREET 21.33 Decreased By ▼ -0.40 (-1.84%)
TRG 54.35 Decreased By ▼ -1.44 (-2.58%)
Pakistan

PESCO seeks consumers help for energy conservation

Published Updated

electricity---PESHAWAR: Keeping in view the present power situation, Peshawar Electric Supply Company (PESCO) has requested consumers to conserve maximum energy.

 

We can overcome the current energy crisis only with the help of consumers' cooperation. PESCO is taking all possible steps to overcome the energy crisis, however, public is requested to conserve energy especially during the peak hours i.e from 5.00 pm to 10.00 pm.

 

The domestic consumers are also requested to use energy savers and tube lights instead of bulbs and must iron their clothes in day time so that energy could be saved.

 

Likewise, power theft also creates power shortage and power distribution system is hence severely over loaded.

 

Tube well operators are required to operate tube wells in accordance with loadshedding schedule, so that customers do not face difficulties in getting water.

 

Copyright APP (Associated Press of Pakistan), 2012
**

Comments

Comments are closed for this article.