BR100 Decreased By (-0.04%)
BR30 Increased By (0.11%)
KSE100 Decreased By (-0.05%)
KSE30 Decreased By (-0.1%)
AGHA 7.35 Decreased By ▼ -0.21 (-2.78%)
BECO 5.10 Increased By ▲ 0.01 (0.2%)
BML 56.10 Increased By ▲ 1.12 (2.04%)
BOP 32.77 Decreased By ▼ -0.21 (-0.64%)
CNERGY 10.33 Increased By ▲ 0.23 (2.28%)
CSIL 5.08 Decreased By ▼ -0.05 (-0.97%)
FCCL 52.09 Increased By ▲ 0.84 (1.64%)
FFL 16.34 Increased By ▲ 0.16 (0.99%)
FNEL 1.20 Increased By ▲ 0.01 (0.84%)
KEL 7.17 Increased By ▲ 0.11 (1.56%)
KOSM 5.94 Increased By ▲ 0.40 (7.22%)
LOTCHEM 26.90 Decreased By ▼ -2.22 (-7.62%)
MLCF 89.63 Increased By ▲ 0.81 (0.91%)
NBP 195.03 Decreased By ▼ -2.46 (-1.25%)
NCPL 55.55 Increased By ▲ 0.53 (0.96%)
NPL 64.60 Decreased By ▼ -0.28 (-0.43%)
OGDC 312.38 Increased By ▲ 0.43 (0.14%)
PACE 10.34 Increased By ▲ 0.13 (1.27%)
PAEL 40.60 Decreased By ▼ -0.39 (-0.95%)
PIBTL 15.97 Increased By ▲ 0.01 (0.06%)
PPL 212.99 Increased By ▲ 0.33 (0.16%)
PRL 53.49 Increased By ▲ 0.95 (1.81%)
PTC 68.55 Decreased By ▼ -0.53 (-0.77%)
SSGC 24.81 Decreased By ▼ -0.29 (-1.16%)
TBL 9.50 Decreased By ▼ -0.12 (-1.25%)
TELE 8.34 Increased By ▲ 0.02 (0.24%)
TPL 18.04 Increased By ▲ 0.29 (1.63%)
TPLP 12.92 Decreased By ▼ -0.30 (-2.27%)
TREET 21.44 Decreased By ▼ -0.30 (-1.38%)
TRG 59.49 Increased By ▲ 2.60 (4.57%)
Pakistan

Pakistan’s first ever waste-to-energy plant gets green signal

The National Electric Power Regulatory Authority (NEPRA) has approved the grant of power generation licence to Laho
Published Updated

The National Electric Power Regulatory Authority (NEPRA) has approved the grant of power generation licence to Lahore Xingzhong Renewable Energy Company Limited, which will be Pakistan’s first such plant with a capacity of turning waste to 40 MW of electricity.

The plant will be setup at Lakhodair, Lahore and will deploy a state-of-the-art incineration-type generation facility and the most suitable waste-to-energy technology. “The project will reduce 2,000 tons/day of the city’s municipal solid waste to generate electricity and is seems as silver bullet to address the municipality’s waste and energy needs of the country,” NEPRA stated in a statement.

In this regard, the power regulator has already announced a Competitive Upfront Tariff of US Cents 10.007/kWh for waste to energy projects based on 25 years operational period, with overall capacity cap of 250 MW.

Meanwhile, the share of each province and Federal Territory have been kept at 50 MW each. “Successful implementation of the project will pave the way for other such initiatives to solve pressing waste disposal problems and challenges of limited space for landfills and gas emissions resulting cleaner cities and healthy life,” NEPRA added.

Copyright Business Recorder, 2018
 

Comments

Comments are closed for this article.