BR100 Decreased By (-0.25%)
BR30 Decreased By (-0.64%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.83 Decreased By ▼ -0.20 (-3.32%)
BML 57.90 Increased By ▲ 5.15 (9.76%)
BOP 33.79 Decreased By ▼ -0.46 (-1.34%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.79 Decreased By ▼ -0.55 (-4.46%)
FCCL 53.49 Decreased By ▼ -0.40 (-0.74%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.84 Decreased By ▼ -0.19 (-1.05%)
FNEL 1.30 No Change ▼ 0.00 (0%)
HUMNL 11.11 Increased By ▲ 0.11 (1%)
KEL 8.02 Decreased By ▼ -0.09 (-1.11%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.40 Decreased By ▼ -0.65 (-0.74%)
NBP 184.24 Decreased By ▼ -2.24 (-1.2%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.25 Increased By ▲ 0.31 (0.78%)
PIAHCLA 26.12 Decreased By ▼ -0.05 (-0.19%)
PIBTL 17.14 Decreased By ▼ -0.18 (-1.04%)
PPL 228.73 Decreased By ▼ -4.05 (-1.74%)
PRL 34.49 Decreased By ▼ -0.46 (-1.32%)
PTC 67.54 Decreased By ▼ -0.02 (-0.03%)
SEARL 90.93 No Change ▼ 0.00 (0%)
SSGC 26.83 Decreased By ▼ -0.34 (-1.25%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.33 Increased By ▲ 0.57 (6.51%)
TREET 24.51 Decreased By ▼ -0.03 (-0.12%)
TRG 71.61 Decreased By ▼ -0.14 (-0.2%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)
Pakistan

Neelum Jhelum project to be inaugurated on Friday

MIRPUR (AJK): Neelum Jhelum Hydropower Project, located in Muzaffarabad has started providing electricity to the Nat
Published April 13, 2018 Updated April 12, 2018 09:28pm

MIRPUR (AJK): Neelum Jhelum Hydropower Project, located in Muzaffarabad has started providing electricity to the National Grid on April 9 on trial basis.

At the first leg of its operation, the project will generate electricity to its full capacity to the tune of 242 MW soon after its scheduled inauguration, WAPDA sources told APP Thursday.

Neelum Jhelum Hydropower Project, has four units with cumulative generation capacity of 969-MW. The first unit started electricity generation followed by the second, third and fourth units at one month interval respectively.

Sources said that Neelum Jhelum Hydropower Project is an engineering marvel with 90 percent of the project being underground in the high mountain areas. Neelum Hydropower consists of three main components i.e. a dam, water-way system comprising 52-km long tunnels and an underground power house.

The project will provide about five billion low-cost hydel electricity to the National Grid every year. Annual benefits of the project have been estimated at Rs.55 billion, sources added.

WAPDA is trying its best to award contracts for Mohmand Dam and Diamer Basha Dam within a year to supplement significantly towards existing water storage and hydropower generation capacities in the country, the sources added.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed for this article.