BR100 Decreased By (-0.07%)
BR30 Increased By (0.02%)
KSE100 Decreased By (-0.04%)
KSE30 Decreased By (-0.06%)
AGHA 7.35 Decreased By ▼ -0.21 (-2.78%)
BECO 5.10 Increased By ▲ 0.01 (0.2%)
BML 56.11 Increased By ▲ 1.13 (2.06%)
BOP 32.77 Decreased By ▼ -0.21 (-0.64%)
CNERGY 10.31 Increased By ▲ 0.21 (2.08%)
CSIL 5.09 Decreased By ▼ -0.04 (-0.78%)
FCCL 52.00 Increased By ▲ 0.75 (1.46%)
FFL 16.28 Increased By ▲ 0.10 (0.62%)
FNEL 1.20 Increased By ▲ 0.01 (0.84%)
KEL 7.18 Increased By ▲ 0.12 (1.7%)
KOSM 6.10 Increased By ▲ 0.56 (10.11%)
LOTCHEM 26.89 Decreased By ▼ -2.23 (-7.66%)
MLCF 89.68 Increased By ▲ 0.86 (0.97%)
NBP 195.30 Decreased By ▼ -2.19 (-1.11%)
NCPL 55.50 Increased By ▲ 0.48 (0.87%)
NPL 64.70 Decreased By ▼ -0.18 (-0.28%)
OGDC 312.39 Increased By ▲ 0.44 (0.14%)
PACE 10.35 Increased By ▲ 0.14 (1.37%)
PAEL 40.88 Decreased By ▼ -0.11 (-0.27%)
PIBTL 15.94 Decreased By ▼ -0.02 (-0.13%)
PPL 212.90 Increased By ▲ 0.24 (0.11%)
PRL 53.40 Increased By ▲ 0.86 (1.64%)
PTC 68.60 Decreased By ▼ -0.48 (-0.69%)
SSGC 24.85 Decreased By ▼ -0.25 (-1%)
TBL 9.52 Decreased By ▼ -0.10 (-1.04%)
TELE 8.33 Increased By ▲ 0.01 (0.12%)
TPL 18.05 Increased By ▲ 0.30 (1.69%)
TPLP 12.97 Decreased By ▼ -0.25 (-1.89%)
TREET 21.45 Decreased By ▼ -0.29 (-1.33%)
TRG 59.45 Increased By ▲ 2.56 (4.5%)
Pakistan

Neelum Jhelum project to be inaugurated on Friday

MIRPUR (AJK): Neelum Jhelum Hydropower Project, located in Muzaffarabad has started providing electricity to the Nat
Published Updated

MIRPUR (AJK): Neelum Jhelum Hydropower Project, located in Muzaffarabad has started providing electricity to the National Grid on April 9 on trial basis.

At the first leg of its operation, the project will generate electricity to its full capacity to the tune of 242 MW soon after its scheduled inauguration, WAPDA sources told APP Thursday.

Neelum Jhelum Hydropower Project, has four units with cumulative generation capacity of 969-MW. The first unit started electricity generation followed by the second, third and fourth units at one month interval respectively.

Sources said that Neelum Jhelum Hydropower Project is an engineering marvel with 90 percent of the project being underground in the high mountain areas. Neelum Hydropower consists of three main components i.e. a dam, water-way system comprising 52-km long tunnels and an underground power house.

The project will provide about five billion low-cost hydel electricity to the National Grid every year. Annual benefits of the project have been estimated at Rs.55 billion, sources added.

WAPDA is trying its best to award contracts for Mohmand Dam and Diamer Basha Dam within a year to supplement significantly towards existing water storage and hydropower generation capacities in the country, the sources added.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed for this article.