BR100 Decreased By (-0.25%)
BR30 Decreased By (-0.64%)
KSE100 Decreased By (-0.41%)
KSE30 Decreased By (-0.67%)
BECO 5.83 Decreased By ▼ -0.20 (-3.32%)
BML 57.90 Increased By ▲ 5.15 (9.76%)
BOP 33.79 Decreased By ▼ -0.46 (-1.34%)
CNERGY 8.15 Decreased By ▼ -0.01 (-0.12%)
DCL 11.79 Decreased By ▼ -0.55 (-4.46%)
FCCL 53.49 Decreased By ▼ -0.40 (-0.74%)
FCSC 5.40 Increased By ▲ 0.18 (3.45%)
FFL 17.84 Decreased By ▼ -0.19 (-1.05%)
FNEL 1.30 No Change ▼ 0.00 (0%)
HUMNL 11.11 Increased By ▲ 0.11 (1%)
KEL 8.02 Decreased By ▼ -0.09 (-1.11%)
KOSM 5.45 Increased By ▲ 0.07 (1.3%)
MLCF 87.40 Decreased By ▼ -0.65 (-0.74%)
NBP 184.24 Decreased By ▼ -2.24 (-1.2%)
PACE 11.62 Increased By ▲ 0.90 (8.4%)
PAEL 40.25 Increased By ▲ 0.31 (0.78%)
PIAHCLA 26.12 Decreased By ▼ -0.05 (-0.19%)
PIBTL 17.14 Decreased By ▼ -0.18 (-1.04%)
PPL 228.73 Decreased By ▼ -4.05 (-1.74%)
PRL 34.49 Decreased By ▼ -0.46 (-1.32%)
PTC 67.54 Decreased By ▼ -0.02 (-0.03%)
SEARL 90.93 No Change ▼ 0.00 (0%)
SSGC 26.83 Decreased By ▼ -0.34 (-1.25%)
TELE 8.53 Decreased By ▼ -0.04 (-0.47%)
THCCL 66.14 Increased By ▲ 6.01 (10%)
TPLP 9.33 Increased By ▲ 0.57 (6.51%)
TREET 24.51 Decreased By ▼ -0.03 (-0.12%)
TRG 71.61 Decreased By ▼ -0.14 (-0.2%)
WAVES 10.98 Increased By ▲ 1.00 (10.02%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)

LAHORE: Work on the first phase under the China-Pakistan Economic Corridor (CPEC) project for upgradation of Pakistan Railways will start in April with the investment of US$3.2 billion.

PR sources told APP on Sunday that track of four sections would be upgraded under the first phase of CPEC for railways.

The PR sections including Lahore-Rawalpindi, Lahore-Multan, Kaluwal-Pindora and Rohari-Nawab Shah will be upraded in this phase.

The upgradation of the track between Lahore and Rawalpindi will cut the duration of journey between the two destinations by two hours, while sharp curves at Kaluwal-Pindora track would be straightened for reduction of duration, sources added.

The sources said that dual tracks would be laid on these sections while the signalling system on these tracks will also be improved, adding that replacement of the outdated signalling system was already in progress from Lahore to Lalamusa and the system from Lalamusa to Peshawar would be improved in the first phase of the CPEC.

The upgradation of rail tracks would also be helpful in improving freight services, the PR sources said.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed for this article.