BR100 Increased By (0.12%)
BR30 Increased By (0.28%)
KSE100 Increased By (0.26%)
KSE30 Increased By (0.26%)
AGHA 7.63 Increased By ▲ 0.04 (0.53%)
BECO 5.57 Increased By ▲ 0.06 (1.09%)
BML 59.74 Increased By ▲ 0.66 (1.12%)
BOP 34.40 Increased By ▲ 0.29 (0.85%)
CNERGY 13.11 Increased By ▲ 0.27 (2.1%)
CSIL 6.41 Increased By ▲ 0.31 (5.08%)
FCCL 58.06 Increased By ▲ 0.40 (0.69%)
FFL 16.23 Increased By ▲ 0.03 (0.19%)
FNEL 1.21 No Change ▼ 0.00 (0%)
KEL 7.43 Decreased By ▼ -0.05 (-0.67%)
KOSM 6.03 Increased By ▲ 0.09 (1.52%)
LOTCHEM 27.67 Decreased By ▼ -0.32 (-1.14%)
MLCF 102.75 Increased By ▲ 2.10 (2.09%)
NBP 205.06 Increased By ▲ 1.31 (0.64%)
NCPL 59.63 Decreased By ▼ -0.94 (-1.55%)
NPL 68.56 Decreased By ▼ -1.40 (-2%)
OGDC 318.92 Decreased By ▼ -1.37 (-0.43%)
PACE 11.05 Decreased By ▼ -0.05 (-0.45%)
PAEL 43.10 Decreased By ▼ -0.02 (-0.05%)
PIBTL 16.63 Increased By ▲ 0.07 (0.42%)
PPL 229.45 Increased By ▲ 0.61 (0.27%)
PRL 70.80 Decreased By ▼ -0.22 (-0.31%)
PTC 71.00 Decreased By ▼ -0.65 (-0.91%)
SSGC 27.41 Increased By ▲ 0.73 (2.74%)
TBL 10.31 Increased By ▲ 0.50 (5.1%)
TELE 8.53 Decreased By ▼ -0.08 (-0.93%)
TPL 23.06 Increased By ▲ 0.82 (3.69%)
TPLP 15.76 Increased By ▲ 0.65 (4.3%)
TREET 24.71 Increased By ▲ 0.58 (2.4%)
TRG 60.29 Increased By ▲ 0.45 (0.75%)
Pakistan

Switching off gas supply to textile industry totally wrong

RECORDER REPORT LAHORE : Federal Minister for Petroleum Dr. Asim Hussain said that switching off gas for 90 days to t
Published Updated

 RECORDER REPORT

LAHORE: Federal Minister for Petroleum Dr. Asim Hussain said that switching off gas for 90 days to the textile industry was totally wrong.

"We will continue and compensate you during winter season," he said while addressing a select gathering of gas-fed textile millers on the invitation of All Pakistan Textile Mills Association (Aptma) at a local club.

He said the president and the prime minister were aware of the problems faced by textile industry.

According to him, no serious effort was made in the past to deal with the problem of gas shortage, saying that the planning of gas distribution to industry was very poor.

The minister said import of 500 mmcfd has been delayed from March 2012 to October, as construction of first terminal in Karachi would start by January.

"We've stepped up exploration, 125mcfd gas would be inducted in the system by December 7, followed by another 30mmcfd within next two months," he added.

Dr Asim said that plans were chalked out to lay down dedicated supply line for the industry.

Aptma chief Gohar Ejaz said a short supply of gas has resulted in 14 percent reduction in production in October 2011.  He said the textile industry was contributing heavily as a backbone of Pakistan economy.

Comments

Comments are closed for this article.