AIRLINK 74.00 Decreased By ▼ -0.25 (-0.34%)
BOP 5.14 Increased By ▲ 0.09 (1.78%)
CNERGY 4.55 Increased By ▲ 0.13 (2.94%)
DFML 37.15 Increased By ▲ 1.31 (3.66%)
DGKC 89.90 Increased By ▲ 1.90 (2.16%)
FCCL 22.40 Increased By ▲ 0.20 (0.9%)
FFBL 33.03 Increased By ▲ 0.31 (0.95%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 10.75 Decreased By ▼ -0.05 (-0.46%)
HBL 115.50 Decreased By ▼ -0.40 (-0.35%)
HUBC 137.10 Increased By ▲ 1.26 (0.93%)
HUMNL 9.95 Increased By ▲ 0.11 (1.12%)
KEL 4.60 Decreased By ▼ -0.01 (-0.22%)
KOSM 4.83 Increased By ▲ 0.17 (3.65%)
MLCF 39.75 Decreased By ▼ -0.13 (-0.33%)
OGDC 138.20 Increased By ▲ 0.30 (0.22%)
PAEL 27.00 Increased By ▲ 0.57 (2.16%)
PIAA 24.24 Decreased By ▼ -2.04 (-7.76%)
PIBTL 6.74 Decreased By ▼ -0.02 (-0.3%)
PPL 123.62 Increased By ▲ 0.72 (0.59%)
PRL 27.40 Increased By ▲ 0.71 (2.66%)
PTC 13.90 Decreased By ▼ -0.10 (-0.71%)
SEARL 61.75 Increased By ▲ 3.05 (5.2%)
SNGP 70.15 Decreased By ▼ -0.25 (-0.36%)
SSGC 10.52 Increased By ▲ 0.16 (1.54%)
TELE 8.57 Increased By ▲ 0.01 (0.12%)
TPLP 11.10 Decreased By ▼ -0.28 (-2.46%)
TRG 64.02 Decreased By ▼ -0.21 (-0.33%)
UNITY 26.76 Increased By ▲ 0.71 (2.73%)
WTL 1.38 No Change ▼ 0.00 (0%)
BR100 7,874 Increased By 36.2 (0.46%)
BR30 25,599 Increased By 139.8 (0.55%)
KSE100 75,342 Increased By 411.7 (0.55%)
KSE30 24,214 Increased By 68.6 (0.28%)

imageKARACHI: The Karachi Electric (KE) on Monday claimed that the power supply to Dhabeji pumping station is as per schedule.

A statement of the utility reiterated that `in the better interest of the people of Karachi, K-Electric provides all possible support to KWSB and all of its strategic installations are exempted from load-shed'.

The utility confirmed that due to a technical fault power supply to Dhabeji was partially affected on Sunday. The KE teams mobilized immediately to rectify the issue and within a short span of time power was restored to all but one pump.

KE teams continued to work round the clock and supply to the last remaining pump was also normalized, the statement added.

It said that the K-Electric has invested significantly to provide primary as well as backup feeder facility available for Dhabeji pumping station.

However, due to KWSB's infrastructural challenges they are unable to fully benefit from this facility, the KE statement further maintained.

`K-Electric appeals to Water Board management to invest in system upgrades', it suggested.

In line with its commitment to provide seamless services, KE teams continue to work on-ground round the clock to provide maximum relief to the people of Karachi.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.