BR100 Decreased By (-0.38%)
BR30 Decreased By (-0.46%)
KSE100 Decreased By (-0.19%)
KSE30 Decreased By (-0.26%)
AGHA 7.43 Decreased By ▼ -0.13 (-1.72%)
BECO 5.08 Decreased By ▼ -0.01 (-0.2%)
BML 55.53 Increased By ▲ 0.55 (1%)
BOP 32.72 Decreased By ▼ -0.26 (-0.79%)
CNERGY 10.29 Increased By ▲ 0.19 (1.88%)
CSIL 5.26 Increased By ▲ 0.13 (2.53%)
FCCL 51.90 Increased By ▲ 0.65 (1.27%)
FFL 16.49 Increased By ▲ 0.31 (1.92%)
FNEL 1.22 Increased By ▲ 0.03 (2.52%)
KEL 7.16 Increased By ▲ 0.10 (1.42%)
KOSM 6.04 Increased By ▲ 0.50 (9.03%)
LOTCHEM 26.73 Decreased By ▼ -2.39 (-8.21%)
MLCF 87.81 Decreased By ▼ -1.01 (-1.14%)
NBP 193.00 Decreased By ▼ -4.49 (-2.27%)
NCPL 55.40 Increased By ▲ 0.38 (0.69%)
NPL 64.88 No Change ▼ 0.00 (0%)
OGDC 310.69 Decreased By ▼ -1.26 (-0.4%)
PACE 10.40 Increased By ▲ 0.19 (1.86%)
PAEL 40.80 Decreased By ▼ -0.19 (-0.46%)
PIBTL 15.83 Decreased By ▼ -0.13 (-0.81%)
PPL 211.00 Decreased By ▼ -1.66 (-0.78%)
PRL 52.86 Increased By ▲ 0.32 (0.61%)
PTC 67.80 Decreased By ▼ -1.28 (-1.85%)
SSGC 24.85 Decreased By ▼ -0.25 (-1%)
TBL 9.50 Decreased By ▼ -0.12 (-1.25%)
TELE 8.29 Decreased By ▼ -0.03 (-0.36%)
TPL 18.25 Increased By ▲ 0.50 (2.82%)
TPLP 12.90 Decreased By ▼ -0.32 (-2.42%)
TREET 21.52 Decreased By ▼ -0.22 (-1.01%)
TRG 58.99 Increased By ▲ 2.10 (3.69%)
Pakistan

Six PMTs installed & energized

Published Updated

imageKARACHI: As many as six pole mounted transformers (PMTs) have been installed and energized in the metropolis.

This was announced by the spokesperson of the K-Electric on Saturday.

He said that K-Electric has installed and energized six PMTs and other necessary electricity infrastructure at Chishti Nagar in Gulistan-e-Jauher.

The Provincial Minister for Social Welfare, Shamim Mumtaz, inaugurated the project in the presence of KE team and other dignitaries.

It was pointed out that Chishti Nagar was previously infested with illegal wiring and theft, also causing faults and tripping in adjoining areas.

This project will enable the provision of reliable power supply to the residents of Chishti Nagar through over 800 new electricity connections.

According to KE spokesperson the new system installed at Chishti Nagar will enable the utility to provide electricity to 800 new households and also enhance load management in surrounding areas.

He also thanked the Sindh government for their collaboration and support.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.