AIRLINK 74.00 Decreased By ▼ -0.25 (-0.34%)
BOP 5.14 Increased By ▲ 0.09 (1.78%)
CNERGY 4.55 Increased By ▲ 0.13 (2.94%)
DFML 37.15 Increased By ▲ 1.31 (3.66%)
DGKC 89.90 Increased By ▲ 1.90 (2.16%)
FCCL 22.40 Increased By ▲ 0.20 (0.9%)
FFBL 33.03 Increased By ▲ 0.31 (0.95%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 10.75 Decreased By ▼ -0.05 (-0.46%)
HBL 115.50 Decreased By ▼ -0.40 (-0.35%)
HUBC 137.10 Increased By ▲ 1.26 (0.93%)
HUMNL 9.95 Increased By ▲ 0.11 (1.12%)
KEL 4.60 Decreased By ▼ -0.01 (-0.22%)
KOSM 4.83 Increased By ▲ 0.17 (3.65%)
MLCF 39.75 Decreased By ▼ -0.13 (-0.33%)
OGDC 138.20 Increased By ▲ 0.30 (0.22%)
PAEL 27.00 Increased By ▲ 0.57 (2.16%)
PIAA 24.24 Decreased By ▼ -2.04 (-7.76%)
PIBTL 6.74 Decreased By ▼ -0.02 (-0.3%)
PPL 123.62 Increased By ▲ 0.72 (0.59%)
PRL 27.40 Increased By ▲ 0.71 (2.66%)
PTC 13.90 Decreased By ▼ -0.10 (-0.71%)
SEARL 61.75 Increased By ▲ 3.05 (5.2%)
SNGP 70.15 Decreased By ▼ -0.25 (-0.36%)
SSGC 10.52 Increased By ▲ 0.16 (1.54%)
TELE 8.57 Increased By ▲ 0.01 (0.12%)
TPLP 11.10 Decreased By ▼ -0.28 (-2.46%)
TRG 64.02 Decreased By ▼ -0.21 (-0.33%)
UNITY 26.76 Increased By ▲ 0.71 (2.73%)
WTL 1.38 No Change ▼ 0.00 (0%)
BR100 7,874 Increased By 36.2 (0.46%)
BR30 25,596 Increased By 136 (0.53%)
KSE100 75,342 Increased By 411.7 (0.55%)
KSE30 24,214 Increased By 68.6 (0.28%)

imageLAHORE: Lahore Chamber of Commerce & Industry (LCCI) on Monday urged the Lahore Electric Supply Company (LESCO) to resolve the issues of tripping and low voltage at Ferozepur Road Industrial Area.

The LCCI President Sheikh Muhammad Arshad made this demand in a meeting with a delegation of Ferozepur Road Industrial Association (FRIA) led by its Chairman Khawaja Shahzeb Akram here. Adnan Khalid Butt and Arshad Baig were prominent among other members of the delegation.

The delegation informed the LCCI president that tripping and unscheduled loadshedding was damaging the industrial activities in the Ferozepur Road Industrial area.

After listening to their point of view, Sheikh Muhammad Arshad said that the industry needed a continuous supply of electricity to keep the units operational and complete the export orders well within the given timeframe.

He said that cheaper and uninterrupted power supply was the only way to achieve economic targets set for the year 2016-17.

The LCCI President said that Ferozepur Road Industrial Area was facing tripping, low voltage and unscheduled loadshedding, therefore LESCO should resolve this issue at the earliest.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.