BR100 Decreased By (-0.38%)
BR30 Decreased By (-0.46%)
KSE100 Decreased By (-0.42%)
KSE30 Decreased By (-0.52%)
AGHA 7.38 Decreased By ▼ -0.18 (-2.38%)
BECO 5.09 No Change ▼ 0.00 (0%)
BML 55.56 Increased By ▲ 0.58 (1.05%)
BOP 32.74 Decreased By ▼ -0.24 (-0.73%)
CNERGY 10.31 Increased By ▲ 0.21 (2.08%)
CSIL 5.30 Increased By ▲ 0.17 (3.31%)
FCCL 51.97 Increased By ▲ 0.72 (1.4%)
FFL 16.50 Increased By ▲ 0.32 (1.98%)
FNEL 1.21 Increased By ▲ 0.02 (1.68%)
KEL 7.16 Increased By ▲ 0.10 (1.42%)
KOSM 6.07 Increased By ▲ 0.53 (9.57%)
LOTCHEM 26.79 Decreased By ▼ -2.33 (-8%)
MLCF 87.99 Decreased By ▼ -0.83 (-0.93%)
NBP 193.75 Decreased By ▼ -3.74 (-1.89%)
NCPL 55.40 Increased By ▲ 0.38 (0.69%)
NPL 64.85 Decreased By ▼ -0.03 (-0.05%)
OGDC 310.69 Decreased By ▼ -1.26 (-0.4%)
PACE 10.42 Increased By ▲ 0.21 (2.06%)
PAEL 40.90 Decreased By ▼ -0.09 (-0.22%)
PIBTL 15.84 Decreased By ▼ -0.12 (-0.75%)
PPL 211.00 Decreased By ▼ -1.66 (-0.78%)
PRL 52.90 Increased By ▲ 0.36 (0.69%)
PTC 68.09 Decreased By ▼ -0.99 (-1.43%)
SSGC 24.84 Decreased By ▼ -0.26 (-1.04%)
TBL 9.50 Decreased By ▼ -0.12 (-1.25%)
TELE 8.30 Decreased By ▼ -0.02 (-0.24%)
TPL 18.30 Increased By ▲ 0.55 (3.1%)
TPLP 13.00 Decreased By ▼ -0.22 (-1.66%)
TREET 21.48 Decreased By ▼ -0.26 (-1.2%)
TRG 59.01 Increased By ▲ 2.12 (3.73%)

imageISLAMABAD: Capacity of the Adhi Field has significantly increased to produce gas, natural gas liquid (NGL), liquified petroleum gas (LPG) with the commencement of its third plant, official sources in Pakistan Petroleum Limited (PPL) said Thursday.

The newly inaugurated plant-III has the potential to produce 25mmscfd (million standard cubic feet per day) gas, 5,300bbld (billion barrels liquid per day) NGL, and 150 mtd (metric ton per day) LPG, they told APP.

Now, with inception of the Plant-III, Adhi Field's production capacity is standing at 75 mmscfd gas, 10,300bbld NGL and 290mtd LPG, the sources informed.

Adhi Field is a joint venture of PPL, Oil and Gas Development Company Limited (OGDCL) and Pakistan Oil fields Limited (POL).

Commenting on future activities, they said that PPL was conducting a new reservoir simulation study, adding that additional six to eight development wells would be required to enhance production of the field. "Wellhead compression and exploration of sub-thrust is planned in 2017," they added.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.