BR100 Decreased By (-0.12%)
BR30 Increased By (0.06%)
KSE100 Increased By (0.04%)
KSE30 Increased By (0.03%)
AGHA 7.36 Decreased By ▼ -0.20 (-2.65%)
BECO 5.09 No Change ▼ 0.00 (0%)
BML 56.10 Increased By ▲ 1.12 (2.04%)
BOP 32.84 Decreased By ▼ -0.14 (-0.42%)
CNERGY 10.34 Increased By ▲ 0.24 (2.38%)
CSIL 5.07 Decreased By ▼ -0.06 (-1.17%)
FCCL 51.85 Increased By ▲ 0.60 (1.17%)
FFL 16.25 Increased By ▲ 0.07 (0.43%)
FNEL 1.20 Increased By ▲ 0.01 (0.84%)
KEL 7.18 Increased By ▲ 0.12 (1.7%)
KOSM 5.92 Increased By ▲ 0.38 (6.86%)
LOTCHEM 26.96 Decreased By ▼ -2.16 (-7.42%)
MLCF 89.50 Increased By ▲ 0.68 (0.77%)
NBP 194.99 Decreased By ▼ -2.50 (-1.27%)
NCPL 55.61 Increased By ▲ 0.59 (1.07%)
NPL 64.83 Decreased By ▼ -0.05 (-0.08%)
OGDC 312.40 Increased By ▲ 0.45 (0.14%)
PACE 10.28 Increased By ▲ 0.07 (0.69%)
PAEL 40.70 Decreased By ▼ -0.29 (-0.71%)
PIBTL 15.95 Decreased By ▼ -0.01 (-0.06%)
PPL 212.70 Increased By ▲ 0.04 (0.02%)
PRL 53.51 Increased By ▲ 0.97 (1.85%)
PTC 69.00 Decreased By ▼ -0.08 (-0.12%)
SSGC 24.85 Decreased By ▼ -0.25 (-1%)
TBL 9.52 Decreased By ▼ -0.10 (-1.04%)
TELE 8.35 Increased By ▲ 0.03 (0.36%)
TPL 18.05 Increased By ▲ 0.30 (1.69%)
TPLP 12.98 Decreased By ▼ -0.24 (-1.82%)
TREET 21.44 Decreased By ▼ -0.30 (-1.38%)
TRG 59.75 Increased By ▲ 2.86 (5.03%)
Pakistan

Railways to upgrade Karachi-Peshawar track

Published Updated

imageISLAMABAD: Under China Pakistan Economic Corridor (CPEC) project, Pakistan Railways would rehabilitate and upgrade main track from Karachi to Peshawar.

"The feasibility study for rehabilitation and upgradation of the main track is in progress," an official in the Ministry of Railways told APP here Friday.

The official said that on completion of CPEC, speed on main line will be increased from 105 kms to 160 kms. Moreover, used material of this project would also be utilized for improvement and strengthening of branch lines.

Apart from this, the official said five years plan was also being prepared for rehabilitation and improvement of railways network.

Elaborating further, he said the railways line from Karachi-Peshawar having length of 1681 kms was fairly in good condition, however, upgrdation was required to run speed trains.

In the current financial year, an allocation of Rs.11,256 million have been allocated for rehabilitation of track and allied structures, the official added.

He said Railways department has spent billions of rupees on rehabilitation of track infrastructure to provide better transportation facilities to people.

To a question, he said Ministry of Railways has substantially improved capacity of Carriage Workshop Lahore from 30 coaches per month in year 2013 to 60-70 at present.

Besides, the official said Carriage Factory Islamabad has been diversified which in addition to manufacturing of new coaches also started overhauling of passenger coaches.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.