BR100 Decreased By (-0.38%)
BR30 Decreased By (-0.46%)
KSE100 Decreased By (-0.42%)
KSE30 Decreased By (-0.52%)
AGHA 7.38 Decreased By ▼ -0.18 (-2.38%)
BECO 5.09 No Change ▼ 0.00 (0%)
BML 55.56 Increased By ▲ 0.58 (1.05%)
BOP 32.74 Decreased By ▼ -0.24 (-0.73%)
CNERGY 10.31 Increased By ▲ 0.21 (2.08%)
CSIL 5.30 Increased By ▲ 0.17 (3.31%)
FCCL 51.97 Increased By ▲ 0.72 (1.4%)
FFL 16.50 Increased By ▲ 0.32 (1.98%)
FNEL 1.21 Increased By ▲ 0.02 (1.68%)
KEL 7.16 Increased By ▲ 0.10 (1.42%)
KOSM 6.07 Increased By ▲ 0.53 (9.57%)
LOTCHEM 26.79 Decreased By ▼ -2.33 (-8%)
MLCF 87.99 Decreased By ▼ -0.83 (-0.93%)
NBP 193.75 Decreased By ▼ -3.74 (-1.89%)
NCPL 55.40 Increased By ▲ 0.38 (0.69%)
NPL 64.85 Decreased By ▼ -0.03 (-0.05%)
OGDC 310.69 Decreased By ▼ -1.26 (-0.4%)
PACE 10.42 Increased By ▲ 0.21 (2.06%)
PAEL 40.90 Decreased By ▼ -0.09 (-0.22%)
PIBTL 15.84 Decreased By ▼ -0.12 (-0.75%)
PPL 211.00 Decreased By ▼ -1.66 (-0.78%)
PRL 52.90 Increased By ▲ 0.36 (0.69%)
PTC 68.09 Decreased By ▼ -0.99 (-1.43%)
SSGC 24.84 Decreased By ▼ -0.26 (-1.04%)
TBL 9.50 Decreased By ▼ -0.12 (-1.25%)
TELE 8.30 Decreased By ▼ -0.02 (-0.24%)
TPL 18.30 Increased By ▲ 0.55 (3.1%)
TPLP 13.00 Decreased By ▼ -0.22 (-1.66%)
TREET 21.48 Decreased By ▼ -0.26 (-1.2%)
TRG 59.01 Increased By ▲ 2.12 (3.73%)
Pakistan

Railways rehabilitate 66 bridges to ensure safety standards

Published Updated

imageISLAMABAD: Pakistan Railways has rehabilitated 66 bridges out of 159 and remaining would be rehabilitated upto June 2017.

The Railway administration desires to provide quick and safe journey to the travelling public within shortest possible time, official sources in the Ministry of Railways told APP on Tuesday.

"There are 13841 bridges including 532 major and 13309 minor bridges over the system. Most of the bridges were constructed well before partition, when Railway System was introduced in the subcontinent and have completed their useful life, the sources added.

They said that due to dedicated inspections and regular maintenance, bridges are generally in satisfactory condition for safe train operation.

In rehabilitation of flood damages, out of 69 bridges, 16 have been completed and remaining will be completed upto June 2017, the sources added.

They said the rehabilitation bridges will ensure safety standards, remove speed restrictions imposed on weak bridges, ensure effective maintenance in reducing the operational cost and meet the increased requirements of freight and passengers.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.