BR100 Decreased By (-0.04%)
BR30 Increased By (0.11%)
KSE100 Decreased By (-0.07%)
KSE30 Decreased By (-0.11%)
AGHA 7.34 Decreased By ▼ -0.22 (-2.91%)
BECO 5.11 Increased By ▲ 0.02 (0.39%)
BML 56.11 Increased By ▲ 1.13 (2.06%)
BOP 32.80 Decreased By ▼ -0.18 (-0.55%)
CNERGY 10.32 Increased By ▲ 0.22 (2.18%)
CSIL 5.09 Decreased By ▼ -0.04 (-0.78%)
FCCL 52.05 Increased By ▲ 0.80 (1.56%)
FFL 16.30 Increased By ▲ 0.12 (0.74%)
FNEL 1.20 Increased By ▲ 0.01 (0.84%)
KEL 7.15 Increased By ▲ 0.09 (1.27%)
KOSM 6.01 Increased By ▲ 0.47 (8.48%)
LOTCHEM 26.89 Decreased By ▼ -2.23 (-7.66%)
MLCF 89.60 Increased By ▲ 0.78 (0.88%)
NBP 195.39 Decreased By ▼ -2.10 (-1.06%)
NCPL 55.54 Increased By ▲ 0.52 (0.95%)
NPL 64.75 Decreased By ▼ -0.13 (-0.2%)
OGDC 312.40 Increased By ▲ 0.45 (0.14%)
PACE 10.35 Increased By ▲ 0.14 (1.37%)
PAEL 40.69 Decreased By ▼ -0.30 (-0.73%)
PIBTL 15.95 Decreased By ▼ -0.01 (-0.06%)
PPL 212.96 Increased By ▲ 0.30 (0.14%)
PRL 53.40 Increased By ▲ 0.86 (1.64%)
PTC 68.50 Decreased By ▼ -0.58 (-0.84%)
SSGC 24.84 Decreased By ▼ -0.26 (-1.04%)
TBL 9.52 Decreased By ▼ -0.10 (-1.04%)
TELE 8.33 Increased By ▲ 0.01 (0.12%)
TPL 18.05 Increased By ▲ 0.30 (1.69%)
TPLP 12.95 Decreased By ▼ -0.27 (-2.04%)
TREET 21.47 Decreased By ▼ -0.27 (-1.24%)
TRG 59.47 Increased By ▲ 2.58 (4.54%)
Pakistan

47pc work completed on Tarbela 4th extension project so far

Published Updated

imageISLAMABAD: As many as 47 per cent work has been completed on the Tarbela 4th Extension Power Project so far and it will be completed by June 2017.

Talking to APP, Project Director Tarbela 4th Extension Power Project Shoail Khan said that the project would cost $ 920 million and additional 1410 MW cheaper hydel electricity would be generated.

He said that earlier the project was scheduled to be completed in 2018, but on the directive of the prime minister, work was expedited on the project and now it would be ready by June 2017.

Sohail Khan said that the World Bank was providing $ 840 million for the project while Water and Power Development Authority arranged the remaining $ 80 million.

He said that three units of 370 MW each would be installed at the power house which would enhance the total electricity generation to 4888 MW from the existing 3478 MW.

Dilating upon the benefits of the project, he said that the project having three units of 370MW each would produce 3,840GWh of cheap hydropower at a time when electricity needs would be at peak in hot and humid weather.

Annual benefits of the project have been estimated at around Rs30.7 billion. The project will pay back its cost in just three years.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.