BR100 Decreased By (-0.91%)
BR30 Decreased By (-1.47%)
KSE100 Decreased By (-0.78%)
KSE30 Decreased By (-0.75%)
AGHA 6.67 Decreased By ▼ -0.01 (-0.15%)
BECO 4.35 Decreased By ▼ -0.02 (-0.46%)
BML 56.17 Decreased By ▼ -1.15 (-2.01%)
BOP 30.12 Decreased By ▼ -0.23 (-0.76%)
CNERGY 12.98 Decreased By ▼ -0.14 (-1.07%)
CSIL 5.31 Decreased By ▼ -0.10 (-1.85%)
FCCL 51.65 Decreased By ▼ -1.14 (-2.16%)
FFL 14.49 Decreased By ▼ -0.23 (-1.56%)
FNEL 1.21 Increased By ▲ 0.09 (8.04%)
KEL 6.06 Decreased By ▼ -0.03 (-0.49%)
KOSM 5.84 Increased By ▲ 0.11 (1.92%)
LOTCHEM 26.17 Decreased By ▼ -0.29 (-1.1%)
MLCF 91.23 Decreased By ▼ -1.93 (-2.07%)
NBP 164.19 Decreased By ▼ -0.47 (-0.29%)
NCPL 53.18 Decreased By ▼ -2.48 (-4.46%)
NPL 59.12 Decreased By ▼ -2.04 (-3.34%)
OGDC 313.39 Decreased By ▼ -3.34 (-1.05%)
PACE 9.77 Decreased By ▼ -0.10 (-1.01%)
PAEL 35.24 Decreased By ▼ -0.39 (-1.09%)
PIBTL 14.71 Increased By ▲ 0.03 (0.2%)
PPL 221.36 Decreased By ▼ -5.55 (-2.45%)
PRL 91.22 Decreased By ▼ -1.80 (-1.94%)
PTC 59.19 Decreased By ▼ -1.07 (-1.78%)
SSGC 23.30 Decreased By ▼ -0.51 (-2.14%)
TBL 8.75 No Change ▼ 0.00 (0%)
TELE 7.61 Decreased By ▼ -0.19 (-2.44%)
TPL 22.03 Decreased By ▼ -0.32 (-1.43%)
TPLP 12.56 Decreased By ▼ -0.41 (-3.16%)
TREET 21.73 Decreased By ▼ -0.43 (-1.94%)
TRG 55.79 Decreased By ▼ -0.77 (-1.36%)
Pakistan

K-Electric and Engro to Boost Power Generation through LNG

Published Updated

imageKARACHI: K-Electric Limited announces the signing of two separate MoUs with Engro, with the objective of increasing power supply to the city and it's adjoining areas using LNG as fuel for the new generation.

Introduction of LNG in the fuel mix is part of KE’s strategy to achieve fuel diversity and enhance power availability in its franchise area within the shortest possible time.

According to details, K-Electric signed the first MoU with Elengy Terminal Pakistan Limited (ETPL), a wholly owned subsidiary of Engro Corporation Limited, which is currently developing the first LNG terminal in Pakistan. Keeping in view the long term forecast of receding gas supply from indigenous sources, KE has shown keen interest in the development of LNG terminal by ETPL.

KE’s press statement added that the second MOU is a tri-partite MoU signed between KE, Engro Powergen, and GE international for the development of a high efficiency 225 MW combined cycle LNG fired power plant at Port Qasim.

Engro Powergen, a subsidiary of Engro Corporation is the lead developer of the project and is expected to engage GE as the technology provider and investor in the project.

KE will off-take power from the project under a long term PPA and has also shown interest to invest in the power company.

The project is expected to be fast tracked and will be the first instance in Pakistan where an LNG fuelled IPP shall be developed.

Copyright Business Recorder, 2014

Comments

Comments are closed for this article.