BR100 No Change (0%)
BR30 No Change (0%)
KSE100 Increased By (0.39%)
KSE30 Increased By (0.46%)
AGHA 6.75 Increased By ▲ 0.07 (1.05%)
BECO 4.42 Increased By ▲ 0.05 (1.14%)
BML 57.00 Decreased By ▼ -0.32 (-0.56%)
BOP 30.50 Increased By ▲ 0.15 (0.49%)
CNERGY 13.18 Increased By ▲ 0.06 (0.46%)
CSIL 5.41 No Change ▼ 0.00 (0%)
FCCL 52.95 Increased By ▲ 0.16 (0.3%)
FFL 14.75 Increased By ▲ 0.03 (0.2%)
FNEL 1.14 Increased By ▲ 0.02 (1.79%)
KEL 6.13 Increased By ▲ 0.04 (0.66%)
KOSM 5.90 Increased By ▲ 0.17 (2.97%)
LOTCHEM 26.65 Increased By ▲ 0.19 (0.72%)
MLCF 93.63 Increased By ▲ 0.47 (0.5%)
NBP 165.50 Increased By ▲ 0.84 (0.51%)
NCPL 55.89 Increased By ▲ 0.23 (0.41%)
NPL 61.10 Decreased By ▼ -0.06 (-0.1%)
OGDC 317.00 Increased By ▲ 0.27 (0.09%)
PACE 9.90 Increased By ▲ 0.03 (0.3%)
PAEL 35.63 No Change ▼ 0.00 (0%)
PIBTL 14.85 Increased By ▲ 0.17 (1.16%)
PPL 227.00 Increased By ▲ 0.09 (0.04%)
PRL 93.80 Increased By ▲ 0.78 (0.84%)
PTC 61.00 Increased By ▲ 0.74 (1.23%)
SSGC 23.70 Decreased By ▼ -0.11 (-0.46%)
TBL 8.70 Decreased By ▼ -0.05 (-0.57%)
TELE 7.81 Increased By ▲ 0.01 (0.13%)
TPL 22.35 Increased By ▲ 0.12 (0.54%)
TPLP 12.97 No Change ▼ 0.00 (0%)
TREET 22.37 Increased By ▲ 0.21 (0.95%)
TRG 57.00 Increased By ▲ 0.44 (0.78%)
Markets

China, Central Asian countries open 3rd gas line

Published Updated

imageISLAMABAD: The third line of the China-Central Asia Natural Gas Pipeline started to transport natural gas to China, China National Petroleum Corporation (CNPC) announced late Sunday.

The 1,830-km Line C of the pipeline, parallel to Line A and Line B, starts at the Turkmen-Uzbek border and runs through central Uzbekistan and southern Kazakhstan before reaching China's northwest region of Xinjiang, Xinhua News reported.

The transport capacity of Line C, which currently stands at 7 billion cubic meters per year, is expected to hit 25 billion cubic meters by the end of 2015, comprising 10 billion cubic meters from Turkmenistan, 10 billion cubic meters from Uzbekistan and 5 billion cubic meters from Kazakhstan.

By then, the three lines, built by CNPC and its central Asian partners, would have a combined capacity of 55 billion cubic meters per year.

Line A was launched in December 2009, and Line B in October 2010. The building of Line D of the pipeline is expected to be launched at the end of this year.

Comments

Comments are closed for this article.