AIRLINK 74.64 Decreased By ▼ -0.21 (-0.28%)
BOP 5.01 Increased By ▲ 0.03 (0.6%)
CNERGY 4.51 Increased By ▲ 0.02 (0.45%)
DFML 42.44 Increased By ▲ 2.44 (6.1%)
DGKC 87.02 Increased By ▲ 0.67 (0.78%)
FCCL 21.58 Increased By ▲ 0.22 (1.03%)
FFBL 33.54 Decreased By ▼ -0.31 (-0.92%)
FFL 9.66 Decreased By ▼ -0.06 (-0.62%)
GGL 10.43 Decreased By ▼ -0.02 (-0.19%)
HBL 114.29 Increased By ▲ 1.55 (1.37%)
HUBC 139.94 Increased By ▲ 2.50 (1.82%)
HUMNL 12.25 Increased By ▲ 0.83 (7.27%)
KEL 5.21 Decreased By ▼ -0.07 (-1.33%)
KOSM 4.50 Decreased By ▼ -0.13 (-2.81%)
MLCF 38.09 Increased By ▲ 0.29 (0.77%)
OGDC 139.16 Decreased By ▼ -0.34 (-0.24%)
PAEL 25.87 Increased By ▲ 0.26 (1.02%)
PIAA 22.20 Increased By ▲ 1.52 (7.35%)
PIBTL 6.80 No Change ▼ 0.00 (0%)
PPL 123.58 Increased By ▲ 1.38 (1.13%)
PRL 26.81 Increased By ▲ 0.23 (0.87%)
PTC 14.01 Decreased By ▼ -0.04 (-0.28%)
SEARL 58.53 Decreased By ▼ -0.45 (-0.76%)
SNGP 68.01 Decreased By ▼ -0.94 (-1.36%)
SSGC 10.47 Increased By ▲ 0.17 (1.65%)
TELE 8.39 Increased By ▲ 0.01 (0.12%)
TPLP 11.05 Decreased By ▼ -0.01 (-0.09%)
TRG 63.21 Decreased By ▼ -0.98 (-1.53%)
UNITY 26.59 Increased By ▲ 0.04 (0.15%)
WTL 1.42 Decreased By ▼ -0.03 (-2.07%)
BR100 7,941 Increased By 103.5 (1.32%)
BR30 25,648 Increased By 196 (0.77%)
KSE100 75,983 Increased By 868.6 (1.16%)
KSE30 24,445 Increased By 330.8 (1.37%)

imageISLAMABAD: Alternative Energy Development Board (AEDB) is pursuing and facilitating 33 wind power projects which are in different stages of development through collaboration of private sector.

There are three wind power projects of 150 MW capacity under construction and will be completed in 2014 while another 13 wind projects having a cumulative capacity of 680 MW are at advance stages and ready to achieve financial closing in 2014.

Highlighting the steps being taken to effectively use alternate sources for power generation, sources at AEDB on Friday said 24 solar power projects having a cumulative capacity of 792.99 MW are also under different stages of development and can achieve Commercial Operation Date by 2015-16 subject to availability of grid and tariff.

In addition, nine biomass/bagasse based power projects are also under development as several sugar mills have approached AEDB for development of power generation projects under Framework for Power Co-generation 2013 (Biomass/Bagasse).

The sources said currently two wind power projects with a cumulative capacity of 105.9 MW (56.4 MW and 49.5 MW) are operational and providing electricity to the grid while a 27 MW Biomass/Waste to Energy plant is operational at Al-Moiz Sugar Industries, D.I.Khan.

They said another 07 MW of Biogas/Waste to Energy plant is operational at Shakarganj Sugar Mills, Jhang and providing electricity to FESCO.

The sources said the government was taking all possible measures for harnessing the renewable energy potential as availability of grid infrastructure is being ensured for upcoming wind and solar power projects.

National Electric Power Regulatory Authority (NEPRA) is in the process of announcing Upfront Tariffs for Alternative & Renewable Energy (ARE) based projects such as solar, biomass etc.

The Framework for Power Co-Generation 2013 (Biomass/Bagasse) has also been announced in order to harness potential of electricity generation from sugar mills on using high pressure boilers.

The AEDB has requested NEPRA to announce rules and regulations for distributed generation in order to enable net-metering through solar and wind energy technologies.

Comments

Comments are closed.