AIRLINK 74.64 Decreased By ▼ -0.21 (-0.28%)
BOP 5.01 Increased By ▲ 0.03 (0.6%)
CNERGY 4.51 Increased By ▲ 0.02 (0.45%)
DFML 42.44 Increased By ▲ 2.44 (6.1%)
DGKC 87.02 Increased By ▲ 0.67 (0.78%)
FCCL 21.58 Increased By ▲ 0.22 (1.03%)
FFBL 33.54 Decreased By ▼ -0.31 (-0.92%)
FFL 9.66 Decreased By ▼ -0.06 (-0.62%)
GGL 10.43 Decreased By ▼ -0.02 (-0.19%)
HBL 114.29 Increased By ▲ 1.55 (1.37%)
HUBC 139.94 Increased By ▲ 2.50 (1.82%)
HUMNL 12.25 Increased By ▲ 0.83 (7.27%)
KEL 5.21 Decreased By ▼ -0.07 (-1.33%)
KOSM 4.50 Decreased By ▼ -0.13 (-2.81%)
MLCF 38.09 Increased By ▲ 0.29 (0.77%)
OGDC 139.16 Decreased By ▼ -0.34 (-0.24%)
PAEL 25.87 Increased By ▲ 0.26 (1.02%)
PIAA 22.20 Increased By ▲ 1.52 (7.35%)
PIBTL 6.80 No Change ▼ 0.00 (0%)
PPL 123.58 Increased By ▲ 1.38 (1.13%)
PRL 26.81 Increased By ▲ 0.23 (0.87%)
PTC 14.01 Decreased By ▼ -0.04 (-0.28%)
SEARL 58.53 Decreased By ▼ -0.45 (-0.76%)
SNGP 68.01 Decreased By ▼ -0.94 (-1.36%)
SSGC 10.47 Increased By ▲ 0.17 (1.65%)
TELE 8.39 Increased By ▲ 0.01 (0.12%)
TPLP 11.05 Decreased By ▼ -0.01 (-0.09%)
TRG 63.21 Decreased By ▼ -0.98 (-1.53%)
UNITY 26.59 Increased By ▲ 0.04 (0.15%)
WTL 1.42 Decreased By ▼ -0.03 (-2.07%)
BR100 7,943 Increased By 105.5 (1.35%)
BR30 25,639 Increased By 187.1 (0.73%)
KSE100 75,983 Increased By 868.6 (1.16%)
KSE30 24,445 Increased By 330.8 (1.37%)

imageISLAMABAD: Pakistan Railways has recovered stolen track worth Rs9 million during last few months.

An official of Pakistan Railways while talking to APP said Railway assets on the closed sections were being watched by the un-armed men which did not provide required protection to the assets.

Now, he said, it has been decided to safeguard these assets through armed police personnel.

He said many FIRs have been registered to arrest the miscreants.

To a question, he said that availability of locomotives for freight train operations had been increased to above 24 locomotives as compared to nine locos last year.

He further said that several steps had been taken to improve availability and reliability of locomotives and it was expected that by the end of current fiscal year the number of locomotives for freight would reach 45.

The government has ordered 58 locomotives to a Chinese company at a cost of Rs19.6 billion of which 23 would reach at Karachi on March 24.

The remaining engines will be received by December 2014, after testing and trial of the locomotives, he added.

He sais these locomotives are equipped with caterpillar US Engine Unit.

Comments

Comments are closed.