AIRLINK 71.69 Decreased By ▼ -2.41 (-3.25%)
BOP 5.00 No Change ▼ 0.00 (0%)
CNERGY 4.39 Increased By ▲ 0.05 (1.15%)
DFML 28.55 Decreased By ▼ -0.99 (-3.35%)
DGKC 82.40 Decreased By ▼ -1.15 (-1.38%)
FCCL 21.95 Decreased By ▼ -0.48 (-2.14%)
FFBL 34.15 Decreased By ▼ -0.75 (-2.15%)
FFL 10.08 Increased By ▲ 0.21 (2.13%)
GGL 10.12 Increased By ▲ 0.12 (1.2%)
HBL 113.00 Increased By ▲ 1.00 (0.89%)
HUBC 140.50 Increased By ▲ 2.81 (2.04%)
HUMNL 8.03 Increased By ▲ 1.05 (15.04%)
KEL 4.38 Decreased By ▼ -0.02 (-0.45%)
KOSM 4.50 Decreased By ▼ -0.09 (-1.96%)
MLCF 38.01 Decreased By ▼ -0.54 (-1.4%)
OGDC 134.69 Decreased By ▼ -1.91 (-1.4%)
PAEL 26.62 Increased By ▲ 1.48 (5.89%)
PIAA 25.40 Decreased By ▼ -1.11 (-4.19%)
PIBTL 6.55 Decreased By ▼ -0.10 (-1.5%)
PPL 121.95 Decreased By ▼ -3.45 (-2.75%)
PRL 27.73 Decreased By ▼ -0.48 (-1.7%)
PTC 13.80 Decreased By ▼ -0.50 (-3.5%)
SEARL 54.89 Increased By ▲ 0.29 (0.53%)
SNGP 69.70 Decreased By ▼ -1.50 (-2.11%)
SSGC 10.40 Decreased By ▼ -0.10 (-0.95%)
TELE 8.50 Decreased By ▼ -0.02 (-0.23%)
TPLP 10.95 Increased By ▲ 0.01 (0.09%)
TRG 60.90 Increased By ▲ 0.20 (0.33%)
UNITY 25.22 Decreased By ▼ -0.11 (-0.43%)
WTL 1.28 Increased By ▲ 0.02 (1.59%)
BR100 7,619 Decreased By -45.8 (-0.6%)
BR30 24,969 Decreased By -56.1 (-0.22%)
KSE100 72,761 Decreased By -3 (-0%)
KSE30 23,625 Decreased By -150.3 (-0.63%)

imageFAISALABAD: Prime Minister Muhammad Nawaz Sharif Saturday inaugurated 40 megawatts (MW), coal fired power project at Sitara Chemical Industries Ltd (SCIL) here.

The prime minister was accompanied by Governor Punjab Malik Rafiq Rajwana, Minister for Water and Power Khawaja Asif, Minister for Planning Ahsan Iqbal, Minister for Commerce Khurram Dastgir and Minister of State for Water and Power Abid Sher Ali.

The 40 MW coal power plant at Sitara Chemical Industries Ltd is the largest of its kind in the industrial sector of Faisalabad. Sitara Chemical Industries Ltd is the flagship company of Sitara Group.

The prime minister unveiled the plaque of the project that has been completed within 27 months costing Rs 3.5 billion.

The plant's boiler is based on Circulating Fluidized Bed Combustion technology having the best automation system.

Continuous emission monitoring system is placed which monitors 24/7 the emission of the gases in the air to protect the environment.

According to a PM House statement, commissioning of 40 mega watts Coal Fired Power Plant is a step towards achieving self-reliance in power generation. Such initiatives by the private sector are extremely encouraging and will prove helpful in overcoming the energy shortage from Pakistan.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.