BR100 Increased By (0.97%)
BR30 Increased By (1.2%)
KSE100 Increased By (0.91%)
KSE30 Increased By (0.9%)
BECO 5.64 Increased By ▲ 0.06 (1.08%)
BML 61.85 Increased By ▲ 0.63 (1.03%)
BOP 34.16 Increased By ▲ 0.48 (1.43%)
CNERGY 8.15 Increased By ▲ 0.07 (0.87%)
DCL 11.80 Increased By ▲ 0.16 (1.37%)
FCCL 53.15 Increased By ▲ 1.01 (1.94%)
FCSC 5.72 Increased By ▲ 0.09 (1.6%)
FFL 18.21 Increased By ▲ 0.20 (1.11%)
FNEL 1.39 Increased By ▲ 0.04 (2.96%)
HUMNL 11.30 Increased By ▲ 0.26 (2.36%)
KEL 7.94 Increased By ▲ 0.10 (1.28%)
KOSM 5.82 Increased By ▲ 0.09 (1.57%)
MLCF 88.62 Increased By ▲ 2.11 (2.44%)
NBP 186.49 Increased By ▲ 2.19 (1.19%)
PACE 11.75 Increased By ▲ 0.10 (0.86%)
PAEL 40.90 Increased By ▲ 0.94 (2.35%)
PIAHCLA 25.90 Increased By ▲ 0.23 (0.9%)
PIBTL 17.47 Increased By ▲ 0.20 (1.16%)
PPL 224.50 Increased By ▲ 1.83 (0.82%)
PRL 34.67 Increased By ▲ 0.21 (0.61%)
PTC 64.68 Increased By ▲ 0.94 (1.47%)
SEARL 91.30 Increased By ▲ 0.84 (0.93%)
SSGC 27.14 Increased By ▲ 0.47 (1.76%)
TELE 9.05 Increased By ▲ 0.14 (1.57%)
THCCL 69.01 Increased By ▲ 0.54 (0.79%)
TPLP 11.07 Decreased By ▼ -0.13 (-1.16%)
TREET 24.86 Increased By ▲ 0.16 (0.65%)
TRG 70.76 Increased By ▲ 0.17 (0.24%)
WAVES 11.24 Increased By ▲ 0.13 (1.17%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)

The Economic Coordination Committee (ECC) has approved Rs 1.140 billion for payment of three months salaries (Jan-March, 2018) to the employees of Pakistan Steel Mills Corporation (PSMC). A meeting of the ECC presided over by Prime Minister Shahid Khaqan Abbasi considered a proposal of Privatization Commission for payment of salaries to employees of PSM who, according to sources, have been staging a protest against non-payment of salaries. The meeting was informed that as the Ramazan has fallen there was a need to make payment of salaries to the PSM employees.
The meeting also considered a proposal for introducing necessary amendments in the relevant laws for the purpose of ensuring tax exemptions at the Gwadar Port and Gwadar Free Zone and constituted a committee to remove any anomalies in the proposed amendments. The ECC while considering the issue of allocation of site to private LNG developers for establishment of LNG Terminal, decided that only those sites at Port Qasim would be allocated for the establishment of LNG Floating Terminal which have been declared safe after undertaking Quantitative Risk Assessment.
The meeting approved a proposal to allocate 35 MMCFD Mari shallow gas and 40 MMCFD of Mari Deep gas to Pakarab Fertilizer Ltd (PFL) for optimal utilization of available installed capacity and to encourage indigenous production of fertilizers and lessen reliance on imported urea.
In order to address the issue of disparity in the sale price and the revenues of SNGPL and SSGCL, the ECC constituted a committee comprising members from Petroleum Division, OGRA, Finance, and Planning, Development & Reforms Division to examine the option of replacing the weighted average cost gas (WACOG) equalization arrangement with a new arrangement of weighted average sale price (WASP) equalization arrangement. The committee will examine all aspects of natural gas sale pricing mechanism and would submit its recommendation to the cabinet within three months.
The ECC also approved five localities for SNGPL and six for SSGCL for setting up LPG air mix plants for the purpose of supply of gas to the residents. The SNGPL localities include Bisham, Upper Dir, Kana, Alpuri, and Narrar. The SSGCL localities include Dalbandin, Taftan, Zheri, Bekar, Kunri and Killi Balozai.

Copyright Business Recorder, 2018

Comments

Comments are closed for this article.