BR100 Decreased By (-0.4%)
BR30 Decreased By (-0.65%)
KSE100 Decreased By (-0.29%)
KSE30 Decreased By (-0.22%)
AGHA 6.56 Decreased By ▼ -0.11 (-1.65%)
BECO 4.40 Increased By ▲ 0.05 (1.15%)
BML 55.89 Decreased By ▼ -0.28 (-0.5%)
BOP 30.05 Decreased By ▼ -0.07 (-0.23%)
CNERGY 12.75 Decreased By ▼ -0.23 (-1.77%)
CSIL 5.21 Decreased By ▼ -0.10 (-1.88%)
FCCL 51.00 Decreased By ▼ -0.65 (-1.26%)
FFL 14.43 Decreased By ▼ -0.06 (-0.41%)
FNEL 1.22 Increased By ▲ 0.01 (0.83%)
KEL 5.97 Decreased By ▼ -0.09 (-1.49%)
KOSM 5.58 Decreased By ▼ -0.26 (-4.45%)
LOTCHEM 26.15 Decreased By ▼ -0.02 (-0.08%)
MLCF 90.33 Decreased By ▼ -0.90 (-0.99%)
NBP 161.45 Decreased By ▼ -2.74 (-1.67%)
NCPL 52.55 Decreased By ▼ -0.63 (-1.18%)
NPL 57.98 Decreased By ▼ -1.14 (-1.93%)
OGDC 315.40 Increased By ▲ 2.01 (0.64%)
PACE 9.70 Decreased By ▼ -0.07 (-0.72%)
PAEL 34.73 Decreased By ▼ -0.51 (-1.45%)
PIBTL 14.23 Decreased By ▼ -0.48 (-3.26%)
PPL 221.00 Decreased By ▼ -0.36 (-0.16%)
PRL 90.89 Decreased By ▼ -0.33 (-0.36%)
PTC 59.25 Increased By ▲ 0.06 (0.1%)
SSGC 23.39 Increased By ▲ 0.09 (0.39%)
TBL 8.65 Decreased By ▼ -0.10 (-1.14%)
TELE 7.40 Decreased By ▼ -0.21 (-2.76%)
TPL 21.00 Decreased By ▼ -1.03 (-4.68%)
TPLP 12.02 Decreased By ▼ -0.54 (-4.3%)
TREET 21.33 Decreased By ▼ -0.40 (-1.84%)
TRG 54.35 Decreased By ▼ -1.44 (-2.58%)
Pakistan

CPPA-G seeks levelized tariff of Rs.8.50 kWh for Azad Pattan project

ISLAMABAD: Central Power Purchase Agency (CPPA-G) has submitted a tariff proposal to National Electric Power Regulat
Published Updated

ISLAMABAD: Central Power Purchase Agency (CPPA-G) has submitted a tariff proposal to National Electric Power Regulatory Authority (NEPRA) for import of power from 700.7 MW Azad Pattan Hydro Power Project.

In the petition, the CPPA-G sought reference levelized tariff of Rs 8.5083 /kWh for a concession period of 30 years, official sources told APP here on Monday.

The power regulator would hold hearing into the matter on Thursday.

The project is run of river hydropower scheme located on the Jhelum River district Sudhnoti (AJK). The installed capacity of the project is 700.7 MW and auxiliary consumption has been assumed as 1 per cent while capacity factor has been claimed as 53.1 per cent.

The project would cost $ 1516.168 million.

Copyright APP (Associated Press of Pakistan), 2018

Comments

Comments are closed for this article.