BR100 Decreased By (-0.38%)
BR30 Decreased By (-0.46%)
KSE100 Decreased By (-0.42%)
KSE30 Decreased By (-0.52%)
AGHA 7.40 Decreased By ▼ -0.16 (-2.12%)
BECO 5.08 Decreased By ▼ -0.01 (-0.2%)
BML 56.50 Increased By ▲ 1.52 (2.76%)
BOP 32.75 Decreased By ▼ -0.23 (-0.7%)
CNERGY 10.29 Increased By ▲ 0.19 (1.88%)
CSIL 5.30 Increased By ▲ 0.17 (3.31%)
FCCL 52.09 Increased By ▲ 0.84 (1.64%)
FFL 16.50 Increased By ▲ 0.32 (1.98%)
FNEL 1.21 Increased By ▲ 0.02 (1.68%)
KEL 7.18 Increased By ▲ 0.12 (1.7%)
KOSM 6.07 Increased By ▲ 0.53 (9.57%)
LOTCHEM 26.85 Decreased By ▼ -2.27 (-7.8%)
MLCF 88.75 Decreased By ▼ -0.07 (-0.08%)
NBP 192.80 Decreased By ▼ -4.69 (-2.37%)
NCPL 55.39 Increased By ▲ 0.37 (0.67%)
NPL 64.80 Decreased By ▼ -0.08 (-0.12%)
OGDC 310.37 Decreased By ▼ -1.58 (-0.51%)
PACE 10.35 Increased By ▲ 0.14 (1.37%)
PAEL 40.95 Decreased By ▼ -0.04 (-0.1%)
PIBTL 15.94 Decreased By ▼ -0.02 (-0.13%)
PPL 212.00 Decreased By ▼ -0.66 (-0.31%)
PRL 53.40 Increased By ▲ 0.86 (1.64%)
PTC 68.32 Decreased By ▼ -0.76 (-1.1%)
SSGC 24.85 Decreased By ▼ -0.25 (-1%)
TBL 9.54 Decreased By ▼ -0.08 (-0.83%)
TELE 8.36 Increased By ▲ 0.04 (0.48%)
TPL 18.43 Increased By ▲ 0.68 (3.83%)
TPLP 13.00 Decreased By ▼ -0.22 (-1.66%)
TREET 21.55 Decreased By ▼ -0.19 (-0.87%)
TRG 58.97 Increased By ▲ 2.08 (3.66%)
Pakistan

Mangla Dam absolutely safe: WAPDA

Published Updated

imageLAHORE: Taking strong exception to a news report aired by a private television channel, WAPDA spokesperson here Monday clarified that Mangla Dam is absolutely safe and no cracks whatsoever appeared in it.

The spokesperson made it clear that a portion of Mirpur-Kotli dual road located at Khaliq Abad in the periphery of Mangla reservoir slid towards the reservoir in 2014.

This dual road, constructed by the AJK is not part of Mangla Dam. However, WAPDA as goodwill gesture, carried out short term measures and rehabilitated the collapsed portion of the road and filled the Mangla reservoir to its maximum level i.e. 1242 feet above sea level.

This year, WAPDA is carrying out the long term measures for rehabilitation of the road adjacent to the reservoir rim.

Contracts are being awarded for the purpose.

The rehabilitation works will be completed soon, the spokesperson said.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.