AIRLINK 73.13 Increased By ▲ 0.33 (0.45%)
BOP 5.00 Decreased By ▼ -0.06 (-1.19%)
CNERGY 4.37 Increased By ▲ 0.04 (0.92%)
DFML 29.97 Decreased By ▼ -0.55 (-1.8%)
DGKC 90.40 Increased By ▲ 4.45 (5.18%)
FCCL 23.02 Increased By ▲ 0.67 (3%)
FFBL 33.55 Increased By ▲ 0.33 (0.99%)
FFL 9.89 Increased By ▲ 0.11 (1.12%)
GGL 10.31 Decreased By ▼ -0.09 (-0.87%)
HBL 112.95 Decreased By ▼ -0.67 (-0.59%)
HUBC 135.50 Decreased By ▼ -0.70 (-0.51%)
HUMNL 9.76 Decreased By ▼ -0.27 (-2.69%)
KEL 4.72 Increased By ▲ 0.06 (1.29%)
KOSM 4.73 Increased By ▲ 0.33 (7.5%)
MLCF 39.80 Increased By ▲ 1.45 (3.78%)
OGDC 133.80 Increased By ▲ 0.40 (0.3%)
PAEL 29.10 Increased By ▲ 1.70 (6.2%)
PIAA 25.00 Increased By ▲ 0.24 (0.97%)
PIBTL 6.93 Increased By ▲ 0.38 (5.8%)
PPL 122.60 Increased By ▲ 1.39 (1.15%)
PRL 27.40 Increased By ▲ 0.25 (0.92%)
PTC 14.65 Increased By ▲ 0.76 (5.47%)
SEARL 60.70 Increased By ▲ 0.30 (0.5%)
SNGP 69.77 Increased By ▲ 1.24 (1.81%)
SSGC 10.42 Increased By ▲ 0.09 (0.87%)
TELE 8.84 Decreased By ▼ -0.21 (-2.32%)
TPLP 11.38 Increased By ▲ 0.12 (1.07%)
TRG 66.40 Increased By ▲ 0.70 (1.07%)
UNITY 25.26 Increased By ▲ 0.01 (0.04%)
WTL 1.56 Increased By ▲ 0.06 (4%)
BR100 7,674 Increased By 40.7 (0.53%)
BR30 25,442 Increased By 269.7 (1.07%)
KSE100 73,056 Increased By 398.1 (0.55%)
KSE30 23,425 Increased By 41.9 (0.18%)

imageISLAMABAD: The Government is focusing on developing additional resources of energy to overcome energy shortage in the country.

For this purpose, it will invest 248 billion rupees on different power projects during the next financial year.

According to Radio Pakistan quoting official sources that fifty-two billion rupees have been allocated for Stage 1 of Dasu Hydropower Project which will produce 2160 MW of electricity, twenty-one billion rupees have been earmarked for land acquisition and construction of Lot one to five for Diamer-Bhasha Dam and Hydropower Project.

Eleven billion rupees will be spent on Neelum-Jhelum Hydropower Project having a capacity of 969 MW, eleven billion rupees on Tarbela-IV Extension Hydropower Project with a capacity of 1410 MW and five billion rupees have been set aside for up-gradation of Guddu Power Project having a capacity of 747 MW of highly economical power.

Copyright APP (Associated Press of Pakistan), 2015

Comments

Comments are closed.