BR100 Increased By (1.66%)
BR30 Increased By (1.75%)
KSE100 Increased By (1.2%)
KSE30 Increased By (1.4%)
AGHA 7.48 Increased By ▲ 0.04 (0.54%)
BECO 5.30 No Change ▼ 0.00 (0%)
BML 57.22 Increased By ▲ 0.16 (0.28%)
BOP 33.92 Increased By ▲ 0.43 (1.28%)
CNERGY 11.10 Increased By ▲ 0.36 (3.35%)
CSIL 6.06 Increased By ▲ 0.02 (0.33%)
FCCL 55.90 Increased By ▲ 1.72 (3.17%)
FFL 16.08 Increased By ▲ 0.01 (0.06%)
FNEL 1.21 Decreased By ▼ -0.01 (-0.82%)
KEL 7.30 Increased By ▲ 0.12 (1.67%)
KOSM 6.10 Increased By ▲ 0.17 (2.87%)
LOTCHEM 27.29 Increased By ▲ 0.32 (1.19%)
MLCF 97.45 Increased By ▲ 2.58 (2.72%)
NBP 204.44 Increased By ▲ 4.15 (2.07%)
NCPL 56.15 Increased By ▲ 0.68 (1.23%)
NPL 65.98 Increased By ▲ 0.36 (0.55%)
OGDC 319.09 Increased By ▲ 5.05 (1.61%)
PACE 10.66 Increased By ▲ 0.15 (1.43%)
PAEL 42.52 Increased By ▲ 0.25 (0.59%)
PIBTL 17.08 Increased By ▲ 0.04 (0.23%)
PPL 221.32 Increased By ▲ 5.11 (2.36%)
PRL 63.42 Increased By ▲ 3.28 (5.45%)
PTC 72.49 Increased By ▲ 0.48 (0.67%)
SSGC 25.93 Increased By ▲ 0.65 (2.57%)
TBL 9.72 Increased By ▲ 0.05 (0.52%)
TELE 8.46 Increased By ▲ 0.21 (2.55%)
TPL 21.47 Increased By ▲ 1.14 (5.61%)
TPLP 14.71 Increased By ▲ 1.34 (10.02%)
TREET 23.19 Increased By ▲ 0.14 (0.61%)
TRG 60.81 Decreased By ▼ -0.04 (-0.07%)
Pakistan

New railway line to be laid from Havelian to Khunjrab: Khawaja

Published Updated

imageISLAMABAD: Minister for Railway Khawaja Saad Rafique on Thursday said there was a proposal for laying a new railway track from Havelian to Khunjerab (Pak-China border).

Replying to a question in the Upper House, he said the project would be taken as part of long-term plan of the China Pakistan Economic Corridor (CPEC) 2025-30 which would usher in socio-economic development of the country.

He said a pre-feasibility study had been carried out by two foreign consulting firms during 2007 and 2008 with an estimated cost of US$10.500 billion.

He added a PC-II had been submitted to Planning Commission for detailed feasibility study of the proposed link. Answering another question, he said contract agreement for procurement of 55 D.E locomotives (4000-4500HP) had been signed with M/S G.E USA, adding the delivery schedule was between December, 2016-17.

He said with available stock of locomotives Pakistan Railways was running 10 freight trains per day ex-port Karachi.

He said after June 2017 with addition of 55 D.E locomotives, Pakistan Railways would be able to run 12 more freight trains per day in addition to existing freight trains.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed for this article.