BR100 Decreased By (-0.7%)
BR30 Decreased By (-0.77%)
KSE100 Decreased By (-0.53%)
KSE30 Decreased By (-0.55%)
BECO 5.66 Decreased By ▼ -0.02 (-0.35%)
BML 63.53 Decreased By ▼ -1.31 (-2.02%)
BOP 33.60 No Change ▼ 0.00 (0%)
CNERGY 8.14 Decreased By ▼ -0.10 (-1.21%)
DCL 11.40 Increased By ▲ 0.05 (0.44%)
FCCL 52.18 Decreased By ▼ -0.73 (-1.38%)
FCSC 5.52 No Change ▼ 0.00 (0%)
FFL 17.75 Decreased By ▼ -0.05 (-0.28%)
FNEL 1.30 No Change ▼ 0.00 (0%)
HUMNL 11.20 Decreased By ▼ -0.04 (-0.36%)
KEL 7.88 Decreased By ▼ -0.09 (-1.13%)
KOSM 5.63 Increased By ▲ 0.19 (3.49%)
MLCF 85.75 Decreased By ▼ -0.26 (-0.3%)
NBP 184.00 Decreased By ▼ -1.00 (-0.54%)
PACE 11.68 Decreased By ▼ -0.34 (-2.83%)
PAEL 40.30 Increased By ▲ 0.09 (0.22%)
PIAHCLA 25.87 Increased By ▲ 0.14 (0.54%)
PIBTL 17.05 Decreased By ▼ -0.27 (-1.56%)
PPL 224.70 Decreased By ▼ -0.60 (-0.27%)
PRL 34.60 Increased By ▲ 0.22 (0.64%)
PTC 64.19 Decreased By ▼ -1.27 (-1.94%)
SEARL 90.40 Decreased By ▼ -0.11 (-0.12%)
SSGC 26.56 Decreased By ▼ -0.20 (-0.75%)
TELE 9.08 Increased By ▲ 0.12 (1.34%)
THCCL 67.23 Decreased By ▼ -2.21 (-3.18%)
TPLP 11.40 Increased By ▲ 0.09 (0.8%)
TREET 24.70 Increased By ▲ 0.15 (0.61%)
TRG 71.14 Decreased By ▼ -0.53 (-0.74%)
WAVES 10.91 Decreased By ▼ -0.54 (-4.72%)
WTL 1.27 Decreased By ▼ -0.01 (-0.78%)

President Pakistan Businessmen and Intellectuals Forum (PBIF), Mian Zahid Hussain has said that the government failed to pay attention to the transmission, distribution and billing system. Feeders usually trip frequently creating problems for masses and the economy; therefore, this sector should be improved.
He said energy situation is improving in the country despite prolonged circular debt. The government settled the infamous circular debt soon after assuming power with a promise that the issue has been buried forever which proved otherwise, he said.
The debt resurfaced soon but government pressed with the plan to establish new power projects and completed forty-seven big and small projects since 2013 improving production capacity by 8694 megawatts, he added. Mian Zahid said that the government completed ten power production projects in 2013; seven more projects became functional in 2014 followed by six power projects in 2015.
Ten projects were completed in 2016 and fourteen during the last year which included LNG-based, coal-fired and nuclear power projects. Few big projects would be completed in the ongoing year of 2018 which will improve power generation capacity but weak transmission and distribution system will pose a serious threat to the situation.

Copyright Business Recorder, 2018

Comments

Comments are closed for this article.