BR100 Decreased By (-0.08%)
BR30 Increased By (0.08%)
KSE100 Decreased By (-0.11%)
KSE30 Decreased By (-0.2%)
AGHA 7.53 Decreased By ▼ -0.10 (-1.31%)
BECO 5.11 Decreased By ▼ -0.46 (-8.26%)
BML 58.30 Decreased By ▼ -1.44 (-2.41%)
BOP 34.58 Increased By ▲ 0.18 (0.52%)
CNERGY 13.68 Increased By ▲ 0.57 (4.35%)
CSIL 6.30 Decreased By ▼ -0.11 (-1.72%)
FCCL 57.55 Decreased By ▼ -0.51 (-0.88%)
FFL 16.50 Increased By ▲ 0.27 (1.66%)
FNEL 1.20 Decreased By ▼ -0.01 (-0.83%)
KEL 7.36 Decreased By ▼ -0.07 (-0.94%)
KOSM 5.98 Decreased By ▼ -0.05 (-0.83%)
LOTCHEM 27.51 Decreased By ▼ -0.16 (-0.58%)
MLCF 101.93 Decreased By ▼ -0.82 (-0.8%)
NBP 203.29 Decreased By ▼ -1.77 (-0.86%)
NCPL 60.47 Increased By ▲ 0.84 (1.41%)
NPL 69.80 Increased By ▲ 1.24 (1.81%)
OGDC 318.48 Decreased By ▼ -0.44 (-0.14%)
PACE 11.12 Increased By ▲ 0.07 (0.63%)
PAEL 42.86 Decreased By ▼ -0.24 (-0.56%)
PIBTL 16.72 Increased By ▲ 0.09 (0.54%)
PPL 230.62 Increased By ▲ 1.17 (0.51%)
PRL 76.73 Increased By ▲ 5.93 (8.38%)
PTC 71.18 Increased By ▲ 0.18 (0.25%)
SSGC 27.10 Decreased By ▼ -0.31 (-1.13%)
TBL 10.28 Decreased By ▼ -0.03 (-0.29%)
TELE 8.56 Increased By ▲ 0.03 (0.35%)
TPL 23.59 Increased By ▲ 0.53 (2.3%)
TPLP 15.45 Decreased By ▼ -0.31 (-1.97%)
TREET 24.51 Decreased By ▼ -0.20 (-0.81%)
TRG 60.09 Decreased By ▼ -0.20 (-0.33%)
Top News

Gas shortage to soar to 1512 mmcfd in 2012-13

RECORDER REPORT ISLAMABAD : The gas shortfall would worsen in the country in the next fiscal year when the projected
Published Updated

 RECORDER REPORT

ISLAMABAD: The gas shortfall would worsen in the country in the next fiscal year when the projected gas deficit would increase on both supply systems, Sui Northern Gas Pipelines (SNGPL) and Sui Southern Gas Company (SSGC), to 1312 MMcfd and 200 MMcfd respectively, sources told Business Recorder.

Sources said that the issue of gas shortage was discussed at the recently held meeting of the Economic Coordination Committee (ECC) of the Cabinet which was informed by the Petroleum Ministry that gas shortage on SNGPL system would escalate from 1,216 MMcfd in 2011-12 to 1,312 MMcfd. The meeting was informed that there would be a steady rise in gas shortages on both systems and, by 2014-15, shortage on SNGPL system would touch 2000 MMcfd and on SSGC to over 500 MMcfd by 2014-15.

They said that the demand-supply gap of gas in the country would increase to 2,395 MMcfd, in case Iran-Pakistan gas pipeline project did not become operational by 2014. The demand-supply gap on SNGPL system, excluding imports, would increase to 1,872 MMcfd following a supply of 1,886 MMcfd against the demand of 3,758 MMcfd by the year of 2014-15. On SSGC system, gap in demand and supply would increase to 513 MMcfd as a result of 1,211 MMcfd supply against 1,536 MMcfd demand.

The meeting was informed that Iran-Pakistan gas pipeline project aims to bring natural gas from Iran to Pakistan by December, 31 2014 and gas sale/purchase agreement has already been signed between Inter State Gas System (ISGS) and National Iranian Oil Company (NIOC). An official said that the meeting was informed that minimum gas supply volume, at Iran-Pakistan border, is 7.52 MMcmd for the first year and 13.98 MMcmd for the second year and 21.5 MMcfd from third year onward until the expiry of IP GSPA, 25 years from commencement date.

The delivery point for SSGC and SNGPL would be Nawabshah with the delivery pressure agreed in consultation with SSGC to be 12 psig. The meeting was informed that the IP gas pipeline appears to be the most feasible option compared to other options.

Comments

Comments are closed for this article.