BR100 Decreased By (-0.7%)
BR30 Decreased By (-0.77%)
KSE100 Decreased By (-0.53%)
KSE30 Decreased By (-0.55%)
BECO 5.66 Decreased By ▼ -0.02 (-0.35%)
BML 63.53 Decreased By ▼ -1.31 (-2.02%)
BOP 33.60 No Change ▼ 0.00 (0%)
CNERGY 8.14 Decreased By ▼ -0.10 (-1.21%)
DCL 11.40 Increased By ▲ 0.05 (0.44%)
FCCL 52.18 Decreased By ▼ -0.73 (-1.38%)
FCSC 5.52 No Change ▼ 0.00 (0%)
FFL 17.75 Decreased By ▼ -0.05 (-0.28%)
FNEL 1.30 No Change ▼ 0.00 (0%)
HUMNL 11.20 Decreased By ▼ -0.04 (-0.36%)
KEL 7.88 Decreased By ▼ -0.09 (-1.13%)
KOSM 5.63 Increased By ▲ 0.19 (3.49%)
MLCF 85.75 Decreased By ▼ -0.26 (-0.3%)
NBP 184.00 Decreased By ▼ -1.00 (-0.54%)
PACE 11.68 Decreased By ▼ -0.34 (-2.83%)
PAEL 40.30 Increased By ▲ 0.09 (0.22%)
PIAHCLA 25.87 Increased By ▲ 0.14 (0.54%)
PIBTL 17.05 Decreased By ▼ -0.27 (-1.56%)
PPL 224.70 Decreased By ▼ -0.60 (-0.27%)
PRL 34.60 Increased By ▲ 0.22 (0.64%)
PTC 64.19 Decreased By ▼ -1.27 (-1.94%)
SEARL 90.40 Decreased By ▼ -0.11 (-0.12%)
SSGC 26.56 Decreased By ▼ -0.20 (-0.75%)
TELE 9.08 Increased By ▲ 0.12 (1.34%)
THCCL 67.23 Decreased By ▼ -2.21 (-3.18%)
TPLP 11.40 Increased By ▲ 0.09 (0.8%)
TREET 24.70 Increased By ▲ 0.15 (0.61%)
TRG 71.14 Decreased By ▼ -0.53 (-0.74%)
WAVES 10.91 Decreased By ▼ -0.54 (-4.72%)
WTL 1.27 Decreased By ▼ -0.01 (-0.78%)

ABBOTTABAD: Deputy Speaker National Assembly (NA) Murtaza Javed Abbassi would inaugurate newly constructed Baldher grid stations tomorrow (Friday).

The newly constructed Baldher grid station of 132000 KV cost of 450 million rupees would help address the low voltage and unscheduled load shedding issues in Tehsil Havelian.

The grid station would also resolve all issues pertaining to electricity in the Tehsil Havelian and lessen the burden on existing grid station. People of Tehsil Havelian thanked deputy speaker NA and Pakistan Muslim League N Govt for continuous efforts from the allocation of funds to the completion of the grid station.

Mujeeb ur Rehman, an electrician of Havelian told APP that low voltage was a huge problem of Tehsil Havelian and the new grid station would provide full voltage, reduce the line losses and also reduce the span of load shedding in the area.

Copyright APP (Associated Press of Pakistan), 2018
 

 

 

 

Comments

Comments are closed for this article.