BR100 Decreased By (-0.08%)
BR30 Increased By (0.08%)
KSE100 Decreased By (-0.11%)
KSE30 Decreased By (-0.2%)
AGHA 7.53 Decreased By ▼ -0.10 (-1.31%)
BECO 5.11 Decreased By ▼ -0.46 (-8.26%)
BML 58.30 Decreased By ▼ -1.44 (-2.41%)
BOP 34.58 Increased By ▲ 0.18 (0.52%)
CNERGY 13.68 Increased By ▲ 0.57 (4.35%)
CSIL 6.30 Decreased By ▼ -0.11 (-1.72%)
FCCL 57.55 Decreased By ▼ -0.51 (-0.88%)
FFL 16.50 Increased By ▲ 0.27 (1.66%)
FNEL 1.20 Decreased By ▼ -0.01 (-0.83%)
KEL 7.36 Decreased By ▼ -0.07 (-0.94%)
KOSM 5.98 Decreased By ▼ -0.05 (-0.83%)
LOTCHEM 27.51 Decreased By ▼ -0.16 (-0.58%)
MLCF 101.93 Decreased By ▼ -0.82 (-0.8%)
NBP 203.29 Decreased By ▼ -1.77 (-0.86%)
NCPL 60.47 Increased By ▲ 0.84 (1.41%)
NPL 69.80 Increased By ▲ 1.24 (1.81%)
OGDC 318.48 Decreased By ▼ -0.44 (-0.14%)
PACE 11.12 Increased By ▲ 0.07 (0.63%)
PAEL 42.86 Decreased By ▼ -0.24 (-0.56%)
PIBTL 16.72 Increased By ▲ 0.09 (0.54%)
PPL 230.62 Increased By ▲ 1.17 (0.51%)
PRL 76.73 Increased By ▲ 5.93 (8.38%)
PTC 71.18 Increased By ▲ 0.18 (0.25%)
SSGC 27.10 Decreased By ▼ -0.31 (-1.13%)
TBL 10.28 Decreased By ▼ -0.03 (-0.29%)
TELE 8.56 Increased By ▲ 0.03 (0.35%)
TPL 23.59 Increased By ▲ 0.53 (2.3%)
TPLP 15.45 Decreased By ▼ -0.31 (-1.97%)
TREET 24.51 Decreased By ▼ -0.20 (-0.81%)
TRG 60.09 Decreased By ▼ -0.20 (-0.33%)

Administrator KMC Muhammad Hussain Syed has said that Shahra-e-Pakistan and S.M. Taufiq Road will be made signal free by constructing four flyovers at this corridor with a cost of Rs 1740 million. Planning for construction of four flyovers at Water Pump, Ayesha Manzil, Dak Khana and Teen Hatti Roundabout was already made and the Technical Services Department was directed to take the measures for immediate construction of these flyovers.
Shara-e-Pakistan and S.M. Taufiq Road were considered very important and busy corridors of city, which were used by the traffic going to and from Superhighway. Administrator Karachi has said that construction of flyovers at four of the very busy roundabouts of this corridor would not only release the pressure of traffic at these spots but also maintain the flow of traffic.
He said all formalities in this regard were already completed and now it was being made sure that the arrangements of alternate routes for traffic were completed before the start of work so that the citizens could be saved from any inconvenience. The estimated cost of flyover at Water Pump and Ayesha Manzil roundabout was Rs 493.95 million each while the proposed flyover at Dak Khana Intersection would cost Rs 472.52million and the flyover at Teen Hatti Roundabout will be constructed with an estimated cost of Rs 267.65million.-PR

Copyright Business Recorder, 2012

Comments

Comments are closed for this article.