BR100 Increased By (0.12%)
BR30 Increased By (0.28%)
KSE100 Increased By (0.26%)
KSE30 Increased By (0.26%)
AGHA 7.63 Increased By ▲ 0.04 (0.53%)
BECO 5.57 Increased By ▲ 0.06 (1.09%)
BML 59.74 Increased By ▲ 0.66 (1.12%)
BOP 34.40 Increased By ▲ 0.29 (0.85%)
CNERGY 13.11 Increased By ▲ 0.27 (2.1%)
CSIL 6.41 Increased By ▲ 0.31 (5.08%)
FCCL 58.06 Increased By ▲ 0.40 (0.69%)
FFL 16.23 Increased By ▲ 0.03 (0.19%)
FNEL 1.21 No Change ▼ 0.00 (0%)
KEL 7.43 Decreased By ▼ -0.05 (-0.67%)
KOSM 6.03 Increased By ▲ 0.09 (1.52%)
LOTCHEM 27.67 Decreased By ▼ -0.32 (-1.14%)
MLCF 102.75 Increased By ▲ 2.10 (2.09%)
NBP 205.06 Increased By ▲ 1.31 (0.64%)
NCPL 59.63 Decreased By ▼ -0.94 (-1.55%)
NPL 68.56 Decreased By ▼ -1.40 (-2%)
OGDC 318.92 Decreased By ▼ -1.37 (-0.43%)
PACE 11.05 Decreased By ▼ -0.05 (-0.45%)
PAEL 43.10 Decreased By ▼ -0.02 (-0.05%)
PIBTL 16.63 Increased By ▲ 0.07 (0.42%)
PPL 229.45 Increased By ▲ 0.61 (0.27%)
PRL 70.80 Decreased By ▼ -0.22 (-0.31%)
PTC 71.00 Decreased By ▼ -0.65 (-0.91%)
SSGC 27.41 Increased By ▲ 0.73 (2.74%)
TBL 10.31 Increased By ▲ 0.50 (5.1%)
TELE 8.53 Decreased By ▼ -0.08 (-0.93%)
TPL 23.06 Increased By ▲ 0.82 (3.69%)
TPLP 15.76 Increased By ▲ 0.65 (4.3%)
TREET 24.71 Increased By ▲ 0.58 (2.4%)
TRG 60.29 Increased By ▲ 0.45 (0.75%)
Print Print edition: 2011-11-26

Qaim reviews work on Thar Coal project

Published Updated

Chief Minister Sindh Syed Qaim Ali Shah held on Friday a joint meeting with Sindh Irrigation Department and delegation of Engro Company engaged in joint venture for power generation at Thar Coal and Energy Project. Qaim said that the Thar Coal and Energy project was one of the important projects of the country. The Chief Minister directed the Irrigation Department to early arrange supply of water up to Block- 2 of the Thar Coal project.
Qaim said that Prime Minister Gilani was expected to visit the Thar Coal and Energy Project soon. Sindh Secretary for Irrigation Khalid Haider Memon informed that necessary surveys had been conducted and reports would be submitted soon. Khalid Mansoor of M/s Engro said that the power plant was scheduled to be completed by 2016. The meeting was attended among others by Sindh Irrigation Minister Jam Saifullah Dharejo and Principal Secretary to CM Alamuddin Bullo.-PR

Copyright Business Recorder, 2011

Comments

Comments are closed for this article.