BR100 Increased By (0.12%)
BR30 Increased By (0.28%)
KSE100 Increased By (0.26%)
KSE30 Increased By (0.26%)
AGHA 7.63 Increased By ▲ 0.04 (0.53%)
BECO 5.57 Increased By ▲ 0.06 (1.09%)
BML 59.74 Increased By ▲ 0.66 (1.12%)
BOP 34.40 Increased By ▲ 0.29 (0.85%)
CNERGY 13.11 Increased By ▲ 0.27 (2.1%)
CSIL 6.41 Increased By ▲ 0.31 (5.08%)
FCCL 58.06 Increased By ▲ 0.40 (0.69%)
FFL 16.23 Increased By ▲ 0.03 (0.19%)
FNEL 1.21 No Change ▼ 0.00 (0%)
KEL 7.43 Decreased By ▼ -0.05 (-0.67%)
KOSM 6.03 Increased By ▲ 0.09 (1.52%)
LOTCHEM 27.67 Decreased By ▼ -0.32 (-1.14%)
MLCF 102.75 Increased By ▲ 2.10 (2.09%)
NBP 205.06 Increased By ▲ 1.31 (0.64%)
NCPL 59.63 Decreased By ▼ -0.94 (-1.55%)
NPL 68.56 Decreased By ▼ -1.40 (-2%)
OGDC 318.92 Decreased By ▼ -1.37 (-0.43%)
PACE 11.05 Decreased By ▼ -0.05 (-0.45%)
PAEL 43.10 Decreased By ▼ -0.02 (-0.05%)
PIBTL 16.63 Increased By ▲ 0.07 (0.42%)
PPL 229.45 Increased By ▲ 0.61 (0.27%)
PRL 70.80 Decreased By ▼ -0.22 (-0.31%)
PTC 71.00 Decreased By ▼ -0.65 (-0.91%)
SSGC 27.41 Increased By ▲ 0.73 (2.74%)
TBL 10.31 Increased By ▲ 0.50 (5.1%)
TELE 8.53 Decreased By ▼ -0.08 (-0.93%)
TPL 23.06 Increased By ▲ 0.82 (3.69%)
TPLP 15.76 Increased By ▲ 0.65 (4.3%)
TREET 24.71 Increased By ▲ 0.58 (2.4%)
TRG 60.29 Increased By ▲ 0.45 (0.75%)

The power shortfall crossed the threshold of 5,500MW during last 24 hours, widening the loadshedding duration up to 20 hours amidst heavy forced closures. According to the available Pepco data, power generation has dipped down to 9,788MW, while the demand peaking at more than 15,510MW, working out a shortfall of 5,722MW, which is a record in April.
Power generation through hydel, thermal, IPPs and RPPs stood at 2486MW, 1390MW, 5670MW and 242MW, respectively. Supply to the KESC was recorded at 660MW. The power consumers cursed the Pepco management for its tall claims against their maladministration. They also criticised the central and provincial governments for their bad governance oozing out of shortage of oil, gas and water in the country. The power experts are of the view that the worst has yet to come with the rise in mercury ahead. They also feared that the present power outage duration of up to 20 hours would further exacerbate in the urban and rural areas with increase in loadshedding.
Meanwhile, a good number of industrial units were practically shut down triggering the problem of unemployment in the country. However, the Pepco management believes that hydel generation is likely to rise in May besides improvement in oil and gas supply, leading to a comfortable situation in near future.

Copyright Business Recorder, 2011

Comments

Comments are closed for this article.