BR100 Increased By (0.18%)
BR30 Decreased By (-0.03%)
KSE100 Increased By (0.16%)
KSE30 Increased By (0.26%)
BECO 5.58 Decreased By ▼ -0.07 (-1.24%)
BML 61.22 Decreased By ▼ -2.66 (-4.16%)
BOP 33.68 Increased By ▲ 0.01 (0.03%)
CNERGY 8.08 Decreased By ▼ -0.06 (-0.74%)
DCL 11.64 Increased By ▲ 0.26 (2.28%)
FCCL 52.14 Decreased By ▼ -0.13 (-0.25%)
FCSC 5.63 Increased By ▲ 0.13 (2.36%)
FFL 18.01 Increased By ▲ 0.29 (1.64%)
FNEL 1.35 Increased By ▲ 0.04 (3.05%)
HUMNL 11.04 Decreased By ▼ -0.14 (-1.25%)
KEL 7.84 Decreased By ▼ -0.02 (-0.25%)
KOSM 5.73 Increased By ▲ 0.09 (1.6%)
MLCF 86.51 Increased By ▲ 0.91 (1.06%)
NBP 184.30 Increased By ▲ 0.68 (0.37%)
PACE 11.65 Decreased By ▼ -0.03 (-0.26%)
PAEL 39.96 Decreased By ▼ -0.31 (-0.77%)
PIAHCLA 25.67 Decreased By ▼ -0.13 (-0.5%)
PIBTL 17.27 Increased By ▲ 0.23 (1.35%)
PPL 222.67 Decreased By ▼ -1.39 (-0.62%)
PRL 34.46 Decreased By ▼ -0.16 (-0.46%)
PTC 63.74 Decreased By ▼ -0.25 (-0.39%)
SEARL 90.46 Increased By ▲ 0.37 (0.41%)
SSGC 26.67 Increased By ▲ 0.07 (0.26%)
TELE 8.91 Decreased By ▼ -0.17 (-1.87%)
THCCL 68.47 Increased By ▲ 1.11 (1.65%)
TPLP 11.20 Decreased By ▼ -0.22 (-1.93%)
TREET 24.70 Decreased By ▼ -0.01 (-0.04%)
TRG 70.59 Decreased By ▼ -0.39 (-0.55%)
WAVES 11.11 Increased By ▲ 0.13 (1.18%)
WTL 1.27 Increased By ▲ 0.01 (0.79%)

Sindh Governor, Dr Ishratul Ibad Khan has called upon the KESC to carry out its short and long term plans, particularly with reference to power generation programme, on a fast track basis.
"The problems in next summer must be lesser than the ones faced this summer" he emphasised and added that work being done on all the projects must be visible to people. He was addressing a meeting held at Governor House here on Saturday in which various power generation issues of the corporation came under consideration.
Those attending the meeting included Chief Secretary Shakil Durrani, Principal Secretary Saleem Khan and others besides John Kim, CEO of a South Korean Engineering Company. John Kim while showing interest in the setting up of a power generation plant in Karachi said that he wants to make investment on BOT basis to set up a 1,000 MW plant.
He informed that the company could supply 47 MW furnace oil operated plants in 11 months, which can be installed immediately. The governor directed that installation of these plants in industrial units should be considered. He asked the corporation to sort out details with the Korean company at the earliest. The chief secretary informed the meeting that provinces, too, could generate energy.

Copyright Associated Press of Pakistan, 2007

Comments

Comments are closed for this article.