AIRLINK 74.00 Decreased By ▼ -0.25 (-0.34%)
BOP 5.14 Increased By ▲ 0.09 (1.78%)
CNERGY 4.55 Increased By ▲ 0.13 (2.94%)
DFML 37.15 Increased By ▲ 1.31 (3.66%)
DGKC 89.90 Increased By ▲ 1.90 (2.16%)
FCCL 22.40 Increased By ▲ 0.20 (0.9%)
FFBL 33.03 Increased By ▲ 0.31 (0.95%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 10.75 Decreased By ▼ -0.05 (-0.46%)
HBL 115.50 Decreased By ▼ -0.40 (-0.35%)
HUBC 137.10 Increased By ▲ 1.26 (0.93%)
HUMNL 9.95 Increased By ▲ 0.11 (1.12%)
KEL 4.60 Decreased By ▼ -0.01 (-0.22%)
KOSM 4.83 Increased By ▲ 0.17 (3.65%)
MLCF 39.75 Decreased By ▼ -0.13 (-0.33%)
OGDC 138.20 Increased By ▲ 0.30 (0.22%)
PAEL 27.00 Increased By ▲ 0.57 (2.16%)
PIAA 24.24 Decreased By ▼ -2.04 (-7.76%)
PIBTL 6.74 Decreased By ▼ -0.02 (-0.3%)
PPL 123.62 Increased By ▲ 0.72 (0.59%)
PRL 27.40 Increased By ▲ 0.71 (2.66%)
PTC 13.90 Decreased By ▼ -0.10 (-0.71%)
SEARL 61.75 Increased By ▲ 3.05 (5.2%)
SNGP 70.15 Decreased By ▼ -0.25 (-0.36%)
SSGC 10.52 Increased By ▲ 0.16 (1.54%)
TELE 8.57 Increased By ▲ 0.01 (0.12%)
TPLP 11.10 Decreased By ▼ -0.28 (-2.46%)
TRG 64.02 Decreased By ▼ -0.21 (-0.33%)
UNITY 26.76 Increased By ▲ 0.71 (2.73%)
WTL 1.38 No Change ▼ 0.00 (0%)
BR100 7,874 Increased By 36.2 (0.46%)
BR30 25,599 Increased By 139.8 (0.55%)
KSE100 75,342 Increased By 411.7 (0.55%)
KSE30 24,214 Increased By 68.6 (0.28%)

imageFAISALABAD: Prime Minister Muhammad Nawaz Sharif Saturday inaugurated 40 megawatts (MW), coal fired power project at Sitara Chemical Industries Ltd (SCIL) here.

The prime minister was accompanied by Governor Punjab Malik Rafiq Rajwana, Minister for Water and Power Khawaja Asif, Minister for Planning Ahsan Iqbal, Minister for Commerce Khurram Dastgir and Minister of State for Water and Power Abid Sher Ali.

The 40 MW coal power plant at Sitara Chemical Industries Ltd is the largest of its kind in the industrial sector of Faisalabad. Sitara Chemical Industries Ltd is the flagship company of Sitara Group.

The prime minister unveiled the plaque of the project that has been completed within 27 months costing Rs 3.5 billion.

The plant's boiler is based on Circulating Fluidized Bed Combustion technology having the best automation system.

Continuous emission monitoring system is placed which monitors 24/7 the emission of the gases in the air to protect the environment.

According to a PM House statement, commissioning of 40 mega watts Coal Fired Power Plant is a step towards achieving self-reliance in power generation. Such initiatives by the private sector are extremely encouraging and will prove helpful in overcoming the energy shortage from Pakistan.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.