BR100 Increased By (0.12%)
BR30 Increased By (0.28%)
KSE100 Increased By (0.26%)
KSE30 Increased By (0.26%)
AGHA 7.63 Increased By ▲ 0.04 (0.53%)
BECO 5.57 Increased By ▲ 0.06 (1.09%)
BML 59.74 Increased By ▲ 0.66 (1.12%)
BOP 34.40 Increased By ▲ 0.29 (0.85%)
CNERGY 13.11 Increased By ▲ 0.27 (2.1%)
CSIL 6.41 Increased By ▲ 0.31 (5.08%)
FCCL 58.06 Increased By ▲ 0.40 (0.69%)
FFL 16.23 Increased By ▲ 0.03 (0.19%)
FNEL 1.21 No Change ▼ 0.00 (0%)
KEL 7.43 Decreased By ▼ -0.05 (-0.67%)
KOSM 6.03 Increased By ▲ 0.09 (1.52%)
LOTCHEM 27.67 Decreased By ▼ -0.32 (-1.14%)
MLCF 102.75 Increased By ▲ 2.10 (2.09%)
NBP 205.06 Increased By ▲ 1.31 (0.64%)
NCPL 59.63 Decreased By ▼ -0.94 (-1.55%)
NPL 68.56 Decreased By ▼ -1.40 (-2%)
OGDC 318.92 Decreased By ▼ -1.37 (-0.43%)
PACE 11.05 Decreased By ▼ -0.05 (-0.45%)
PAEL 43.10 Decreased By ▼ -0.02 (-0.05%)
PIBTL 16.63 Increased By ▲ 0.07 (0.42%)
PPL 229.45 Increased By ▲ 0.61 (0.27%)
PRL 70.80 Decreased By ▼ -0.22 (-0.31%)
PTC 71.00 Decreased By ▼ -0.65 (-0.91%)
SSGC 27.41 Increased By ▲ 0.73 (2.74%)
TBL 10.31 Increased By ▲ 0.50 (5.1%)
TELE 8.53 Decreased By ▼ -0.08 (-0.93%)
TPL 23.06 Increased By ▲ 0.82 (3.69%)
TPLP 15.76 Increased By ▲ 0.65 (4.3%)
TREET 24.71 Increased By ▲ 0.58 (2.4%)
TRG 60.29 Increased By ▲ 0.45 (0.75%)
Pakistan

Gap between electricity supply and demand widening

Published Updated

ElectricISLAMABAD: The persistent load shedding schedule is causing numerous troubles as the gap between the electricity supply and demand is continuously widening in the country.

According to a private news channel, the total power generation of Pakistan Electric Power Company (PEPCO) is currently recorded at 9,500 megawatts, while the demand has shot up to 15,500 megawatt, leaving a shortfall of 6,000 megawatts.

The duration of power outage in all major cities has been increased to 12 hours a day while in rural areas it has been increased to 18 hours.

Khyber Pakhtunkhwa is facing loadshedding for more than 16 hours a day and power comes for an hour after every two to three hours of loadshedding.

The residents of Quetta are suffering from six to eight hours a day of consistent power outage.

The electricity shortfall in Sindh, including Hyderabad, has reached 800 megawatts and the citizens are bearing long hours of unscheduled and unpredictable load shedding.

In various cities of Punjab 10 to 16 hours load shedding has crippled the cycle of life.

Copyright APP (Associated Press of Pakistan), 2011

Comments

Comments are closed for this article.