BR100 Increased By (0.99%)
BR30 Increased By (1.17%)
KSE100 Increased By (0.81%)
KSE30 Increased By (0.77%)
BECO 5.68 Increased By ▲ 0.09 (1.61%)
BML 64.84 Increased By ▲ 3.81 (6.24%)
BOP 33.60 Increased By ▲ 0.35 (1.05%)
CNERGY 8.24 Increased By ▲ 0.19 (2.36%)
DCL 11.35 Increased By ▲ 0.05 (0.44%)
FCCL 52.91 Decreased By ▼ -0.02 (-0.04%)
FCSC 5.52 Increased By ▲ 0.18 (3.37%)
FFL 17.80 Increased By ▲ 0.19 (1.08%)
FNEL 1.30 Decreased By ▼ -0.01 (-0.76%)
HUMNL 11.24 Increased By ▲ 0.12 (1.08%)
KEL 7.97 Increased By ▲ 0.08 (1.01%)
KOSM 5.44 Increased By ▲ 0.11 (2.06%)
MLCF 86.01 Increased By ▲ 0.66 (0.77%)
NBP 185.00 Increased By ▲ 3.71 (2.05%)
PACE 12.02 Increased By ▲ 0.49 (4.25%)
PAEL 40.21 Increased By ▲ 0.80 (2.03%)
PIAHCLA 25.73 Increased By ▲ 0.10 (0.39%)
PIBTL 17.32 Increased By ▲ 0.17 (0.99%)
PPL 225.30 Increased By ▲ 0.48 (0.21%)
PRL 34.38 Increased By ▲ 0.20 (0.59%)
PTC 65.46 Increased By ▲ 0.38 (0.58%)
SEARL 90.51 Increased By ▲ 0.91 (1.02%)
SSGC 26.76 Increased By ▲ 0.45 (1.71%)
TELE 8.96 Increased By ▲ 0.58 (6.92%)
THCCL 69.44 Increased By ▲ 0.10 (0.14%)
TPLP 11.31 Increased By ▲ 1.03 (10.02%)
TREET 24.55 Increased By ▲ 0.35 (1.45%)
TRG 71.67 Increased By ▲ 2.13 (3.06%)
WAVES 11.45 Increased By ▲ 0.42 (3.81%)
WTL 1.28 Increased By ▲ 0.01 (0.79%)

In line with its commitment to deliver safe and affordable electricity across its network, K-Electric has managed to significantly improve the reliability of power supply across its network; a testament of which is bringing down its T&D losses from almost 36 percent in 2009 to under 22 percent in 2016, along with exemption of over 61 percent of Karachi from loadshedding whereas provision of uninterrupted power supply to all industrial zones.
In 2016, the utility managed to extend exemption and reduce loadshedding in various loss-incurred communities across the city including Sharifabad, Ishaqabad and Batwa Nagar in Liaquatabad; Ismailiya Platinum area and Khwaja Jamaat Khana in Garden; Mehmoodabad and some parts of Shantinagar in Gulshan-e-Iqbal and major portion of FB Area Block 9, 15, 18 and 19. On the other hand, efforts are currently underway to reduce loadshedding in Baloch Para, Patel Para and Ranchore Line.
According to KE spokesperson, "The utility managed to further increase transparency and convenience for consumers through initiatives like mobile facilitation vans (IBC on Wheels) and establishment of new connection front desks besides upgrading its distribution infrastructure in various areas. The continuous up gradation of infrastructure reinforces our long-term commitment to serving the people of Karachi. Our low-cost meter drives and camps provide a one-stop shop for our consumers to approach us and instantly apply and acquire low-cost meters and eventually, a connection."
KE is closely aligned with its objective of putting consumers at the heart of everything it does, and has always been at the forefront to introduce cutting-edge technology and innovative services per the evolving consumer needs and expectations. The power utility has invested $1.2 billion into its network since 2009, enhancing its generation and improving its transmission and distribution infrastructure.-PR

Comments

Comments are closed for this article.