BR100 Increased By (0.2%)
BR30 Increased By (0.32%)
KSE100 Increased By (0.37%)
KSE30 Increased By (0.23%)
AGHA 7.65 Increased By ▲ 0.02 (0.26%)
BECO 5.30 Decreased By ▼ -0.27 (-4.85%)
BML 60.00 Increased By ▲ 0.26 (0.44%)
BOP 34.74 Increased By ▲ 0.34 (0.99%)
CNERGY 12.72 Decreased By ▼ -0.39 (-2.97%)
CSIL 6.54 Increased By ▲ 0.13 (2.03%)
FCCL 57.93 Decreased By ▼ -0.13 (-0.22%)
FFL 16.32 Increased By ▲ 0.09 (0.55%)
FNEL 1.21 No Change ▼ 0.00 (0%)
KEL 7.44 Increased By ▲ 0.01 (0.13%)
KOSM 6.10 Increased By ▲ 0.07 (1.16%)
LOTCHEM 27.70 Increased By ▲ 0.03 (0.11%)
MLCF 102.70 Decreased By ▼ -0.05 (-0.05%)
NBP 205.00 Decreased By ▼ -0.06 (-0.03%)
NCPL 61.60 Increased By ▲ 1.97 (3.3%)
NPL 70.54 Increased By ▲ 1.98 (2.89%)
OGDC 320.15 Increased By ▲ 1.23 (0.39%)
PACE 11.22 Increased By ▲ 0.17 (1.54%)
PAEL 43.14 Increased By ▲ 0.04 (0.09%)
PIBTL 16.63 No Change ▼ 0.00 (0%)
PPL 232.71 Increased By ▲ 3.26 (1.42%)
PRL 69.00 Decreased By ▼ -1.80 (-2.54%)
PTC 71.16 Increased By ▲ 0.16 (0.23%)
SSGC 27.40 Decreased By ▼ -0.01 (-0.04%)
TBL 10.33 Increased By ▲ 0.02 (0.19%)
TELE 8.57 Increased By ▲ 0.04 (0.47%)
TPL 23.20 Increased By ▲ 0.14 (0.61%)
TPLP 15.70 Decreased By ▼ -0.06 (-0.38%)
TREET 24.89 Increased By ▲ 0.18 (0.73%)
TRG 60.25 Decreased By ▼ -0.04 (-0.07%)
Top News

PM directs petroleum ministry to address gas supply issue

Published Updated

gilani_meetingISLAMABAD: Prime Minister Syed Yusuf Raza Gilani on Thursday directed the Ministry of Petroleum and Natural Resources to take immediate steps to resolve the issue of gas supply to both domestic and industrial sectors.

The Prime Minister gave these directions while chairing a meeting on Liquid Natural Gas and gas import at the PM House.

The Secretary, Ministry of Petroleum and Natural Resources, briefed the meeting that 100 MMCFD gas from Hyderabad Gas Field would be available within a month. This gas would be put into the national system to ease pressure of gas outages on the domestic and industrial consumers.

The Secretary Petroleum said that Khyber Pakhtunkhwa would get 15 MMCFD gas from Kohat Gas Field immediately which would be put into the national system.

He said the government had taken emergency measures to address the gas shortage in Rawalpindi and Islamabad and the issue had been resolved by 80 percent.

The Secretary said the negotiations with CNG Association were underway in order to rationalize the supply of gas to the CNG stations.

He said priority would be given to the domestic consumers in these negotiations.

The Secretary said it was also decided to negotiate terms with the industrial sector aimed at ensuring uninterrupted supply of gas to the households.

The Ministry of Petroleum informed that the Steering Committee consisting of Chief Minister Balochistan, Foreign Minister, and Secretaries of Finance and Petroleum Ministries had approved the financial consultancy for Pakistan-Iran gas pipeline, which was a major step forward as far as the project was concerned.

The Secretary apprised the meeting that 750 MMCFT more gas would be flowing into the system by November 2014, which would be sufficient to meet the 40 percent country's gas deficiency.

The Prime Minister appreciated the efforts of the Ministries for undertaking major steps on fast-track basis.

The meeting was attended by Minister for Finance Dr Abdul Hafeez Sheikh, Minister for Petroleum Dr Asim Hussain, Secretary Finance Dr Waqar Masood Khan, Secretary Water and Power Imtiaz Hussain Qazi, Secretary Petroleum Muhammad Ejaz Chaudhry, Secretary Cabinet Nargis Sethi, Chairman NEPRA Khalid Saeed, Chairman FBR Salman Saddique, Chairman OGRA Sabir Hussain, Chairman Port Qasim Authority Vice Admiral Muhammad Shafique, and MD Private Power and Infrastructure Board N.A. Zuberi.

Copyright APP (Associated Press of Pakistan), 2011

Comments

Comments are closed for this article.