BR100 Increased By (1.02%)
BR30 Increased By (1.68%)
KSE100 Increased By (0.98%)
KSE30 Increased By (1.06%)
AGHA 7.69 Increased By ▲ 0.23 (3.08%)
BECO 5.31 Increased By ▲ 0.04 (0.76%)
BML 61.23 Increased By ▲ 3.97 (6.93%)
BOP 36.00 Increased By ▲ 1.25 (3.6%)
CNERGY 11.25 Increased By ▲ 0.19 (1.72%)
CSIL 6.17 Increased By ▲ 0.34 (5.83%)
FCCL 56.88 Increased By ▲ 0.46 (0.82%)
FFL 16.51 Increased By ▲ 0.10 (0.61%)
FNEL 1.20 No Change ▼ 0.00 (0%)
KEL 7.42 Increased By ▲ 0.10 (1.37%)
KOSM 6.05 Decreased By ▼ -0.10 (-1.63%)
LOTCHEM 27.20 Increased By ▲ 0.08 (0.29%)
MLCF 103.09 Increased By ▲ 5.15 (5.26%)
NBP 207.63 Increased By ▲ 0.75 (0.36%)
NCPL 61.92 Increased By ▲ 5.50 (9.75%)
NPL 72.18 Increased By ▲ 6.41 (9.75%)
OGDC 318.49 Increased By ▲ 2.19 (0.69%)
PACE 11.06 Increased By ▲ 0.19 (1.75%)
PAEL 44.38 Increased By ▲ 2.08 (4.92%)
PIBTL 16.90 Increased By ▲ 0.12 (0.72%)
PPL 222.48 Increased By ▲ 1.79 (0.81%)
PRL 63.81 Increased By ▲ 0.16 (0.25%)
PTC 73.16 Increased By ▲ 1.34 (1.87%)
SSGC 27.25 Increased By ▲ 0.17 (0.63%)
TBL 9.88 Increased By ▲ 0.16 (1.65%)
TELE 8.81 Increased By ▲ 0.08 (0.92%)
TPL 20.34 Increased By ▲ 0.94 (4.85%)
TPLP 14.97 Increased By ▲ 0.19 (1.29%)
TREET 24.10 Increased By ▲ 0.70 (2.99%)
TRG 62.37 Increased By ▲ 0.96 (1.56%)

The Federal Minister for Water and Power, Naveed Qamar, on Tuesday said that no discrimination is being made with Punjab regarding gas and electricity load shedding. The load management quota is being implemented in accordance with prescribed quota of electricity and gas of the provinces, he said while replying to queries of reporters here at Allama Iqbal International Airport.
He said that load management was being carried out in accordance with a set quota of power and gas of the provinces. When asked about any increase in power tariff, the Minister said that there was no plan in hand to raise power tariff in the near future.
About less production by power stations, Qamar said that the government was focusing on optimum utilisation of local resources to operate oil and gas power stations. However, he added that furnace oil prices are scaling up at international level, which would increase input costs, ultimately raising the cost of power production. About construction of controversial dams by India, Naveed said Pakistan had formed a body to monitor and sort out all issues related to an arbitration process between Islamabad and New Delhi on the Kishan Ganga Dam.

Copyright Business Recorder, 2011

Comments

Comments are closed for this article.