AIRLINK 74.00 Decreased By ▼ -0.25 (-0.34%)
BOP 5.14 Increased By ▲ 0.09 (1.78%)
CNERGY 4.55 Increased By ▲ 0.13 (2.94%)
DFML 37.15 Increased By ▲ 1.31 (3.66%)
DGKC 89.90 Increased By ▲ 1.90 (2.16%)
FCCL 22.40 Increased By ▲ 0.20 (0.9%)
FFBL 33.03 Increased By ▲ 0.31 (0.95%)
FFL 9.75 Decreased By ▼ -0.04 (-0.41%)
GGL 10.75 Decreased By ▼ -0.05 (-0.46%)
HBL 115.50 Decreased By ▼ -0.40 (-0.35%)
HUBC 137.10 Increased By ▲ 1.26 (0.93%)
HUMNL 9.95 Increased By ▲ 0.11 (1.12%)
KEL 4.60 Decreased By ▼ -0.01 (-0.22%)
KOSM 4.83 Increased By ▲ 0.17 (3.65%)
MLCF 39.75 Decreased By ▼ -0.13 (-0.33%)
OGDC 138.20 Increased By ▲ 0.30 (0.22%)
PAEL 27.00 Increased By ▲ 0.57 (2.16%)
PIAA 24.24 Decreased By ▼ -2.04 (-7.76%)
PIBTL 6.74 Decreased By ▼ -0.02 (-0.3%)
PPL 123.62 Increased By ▲ 0.72 (0.59%)
PRL 27.40 Increased By ▲ 0.71 (2.66%)
PTC 13.90 Decreased By ▼ -0.10 (-0.71%)
SEARL 61.75 Increased By ▲ 3.05 (5.2%)
SNGP 70.15 Decreased By ▼ -0.25 (-0.36%)
SSGC 10.52 Increased By ▲ 0.16 (1.54%)
TELE 8.57 Increased By ▲ 0.01 (0.12%)
TPLP 11.10 Decreased By ▼ -0.28 (-2.46%)
TRG 64.02 Decreased By ▼ -0.21 (-0.33%)
UNITY 26.76 Increased By ▲ 0.71 (2.73%)
WTL 1.38 No Change ▼ 0.00 (0%)
BR100 7,874 Increased By 36.2 (0.46%)
BR30 25,599 Increased By 139.8 (0.55%)
KSE100 75,342 Increased By 411.7 (0.55%)
KSE30 24,214 Increased By 68.6 (0.28%)

imageISLAMABAD: The Cabinet Committee on Energy Wednesday reviewed progress on the ongoing power projects to assess whether the time-lines of the schedule of activities were being observed.

Finance Minister Senator Mohammad Ishaq Dar chaired the meeting which also reviewed the progress of on-going power sector projects in the country and the projects in pipeline.

Federal Minister for Water and Power, Khawaja Muhammad Asif, Federal Minister for Petroleum and Natural Resources, Shahid Khaqan Abbasi and Secretary to Prime Minister and senior officials of the relevant ministries attended the meeting.

Secretary Water and Power briefed the meeting on the energy projects and also dilated on arrangements for evacuation of the electricity to be produced in future.

Secretary Ministry of Petroleum and Natural Resources gave an overview of the supply of natural gas and fuel that would be needed to facilitate the upcoming power projects.

Secretary Water and Power also briefed the meeting about the current state of power generation in the country.

He said that in line with the Prime Minister's instructions, maximum facilitation has been provided to general public during the holy month of Ramazan by ensuring smooth and uninterrupted supply of electricity at the time of Sehar and Iftar.

A proper mechanism has been in place to address complaints of any breakdown, he said adding despite severe heat wave experienced in early May and the resultant increased power usage, load management has been carried out with due care.

Furthermore no power unit suffered any shut down this summer which helped maintain supply of electricity to the optimum possible level.

The Finance Minister, on the occasion said that the Prime Minister had desired a detailed update on the progress of ongoing projects and emphasized expediting work on these projects.

He directed the Ministry of Water and Power to ensure completion of on-going projects as per schedule. A detailed report containing up-to-date progress would be submitted to the Prime Minister.

Copyright APP (Associated Press of Pakistan), 2016

Comments

Comments are closed.