BR100 Decreased By (-0.08%)
BR30 Increased By (0.08%)
KSE100 Decreased By (-0.11%)
KSE30 Decreased By (-0.2%)
AGHA 7.53 Decreased By ▼ -0.10 (-1.31%)
BECO 5.11 Decreased By ▼ -0.46 (-8.26%)
BML 58.30 Decreased By ▼ -1.44 (-2.41%)
BOP 34.58 Increased By ▲ 0.18 (0.52%)
CNERGY 13.68 Increased By ▲ 0.57 (4.35%)
CSIL 6.30 Decreased By ▼ -0.11 (-1.72%)
FCCL 57.55 Decreased By ▼ -0.51 (-0.88%)
FFL 16.50 Increased By ▲ 0.27 (1.66%)
FNEL 1.20 Decreased By ▼ -0.01 (-0.83%)
KEL 7.36 Decreased By ▼ -0.07 (-0.94%)
KOSM 5.98 Decreased By ▼ -0.05 (-0.83%)
LOTCHEM 27.51 Decreased By ▼ -0.16 (-0.58%)
MLCF 101.93 Decreased By ▼ -0.82 (-0.8%)
NBP 203.29 Decreased By ▼ -1.77 (-0.86%)
NCPL 60.47 Increased By ▲ 0.84 (1.41%)
NPL 69.80 Increased By ▲ 1.24 (1.81%)
OGDC 318.48 Decreased By ▼ -0.44 (-0.14%)
PACE 11.12 Increased By ▲ 0.07 (0.63%)
PAEL 42.86 Decreased By ▼ -0.24 (-0.56%)
PIBTL 16.72 Increased By ▲ 0.09 (0.54%)
PPL 230.62 Increased By ▲ 1.17 (0.51%)
PRL 76.73 Increased By ▲ 5.93 (8.38%)
PTC 71.18 Increased By ▲ 0.18 (0.25%)
SSGC 27.10 Decreased By ▼ -0.31 (-1.13%)
TBL 10.28 Decreased By ▼ -0.03 (-0.29%)
TELE 8.56 Increased By ▲ 0.03 (0.35%)
TPL 23.59 Increased By ▲ 0.53 (2.3%)
TPLP 15.45 Decreased By ▼ -0.31 (-1.97%)
TREET 24.51 Decreased By ▼ -0.20 (-0.81%)
TRG 60.09 Decreased By ▼ -0.20 (-0.33%)
World

German nuclear plant outages

Published Updated

imageFRANKFURT: The following table lists planned outages at German nuclear power plants.

It gives dates for previous outages, plants returning online and planned shutdowns. Sources are the Web pages offered by RWE and EnBW, and, for E.ON installations, the EEX exchange's transparency website.

The maximum national capacity of 12,696 MW can be utilised.

Germany took the axe to the bulk of its nuclear capacity in the summer of 2011, switching off the seven oldest blocks plus Vattenfall's Kruemmel permanently after the Japan nuclear crisis earlier that year raised safety concerns.

German policymakers agreed to leave the 8,821 MW represented by the eight blocks offline when a three-month moratorium expired at the end of June 2011.

Before the Fukushima crisis, German (gross) nuclear capacity had amounted to 21,500 MW.

The policy switch in 2011 reversed longer nuclear life cycles that had been granted to the remaining nuclear power stations in the autumn of 2010. It also sped up the timetable for closure of all remaining capacity by 2022.

Copyright Reuters, 2015

Comments

Comments are closed for this article.